Changed traffic conditions at Gerringong

21 August 2014

Member for Kiama Gareth Ward is today advising motorists of changed traffic conditions on the Princes Highway near Belinda Street at Gerringong for essential road work.

“Motorists are using one lane of the highway under the direction of traffic control, after the past few days of heavy rain damaged an embankment which supports the side track on the Princes Highway,” Mr Ward said.

“Damage to the embankment has caused small cracks and rutting to appear on the road surface, reducing safety for motorists.

“The stability of the embankment has been assessed by geotechnical engineers and the condition of the road surface is being monitored by surveyors.

“Work to stabilise the bottom of the embankment with rock fill has been carried out.

“The changed traffic conditions are expected to be in place until at least Tuesday 26 August, weather permitting, while work to build new road surface is carried out. When complete, the highway will reopen to two lanes,” he said.

“Roads and Maritime has worked with the Environment Protection Authority to allow this work to be carried out around the clock to fix this issue as quickly as possible.

“I certainly thank local motorists for their understanding and patience whilst this work is being carried out. This work will minimise future disruptions to motorists.

“Motorists are advised to plan their journey, allow extra travel time and obey all signs,” Mr Ward said.

For the latest traffic information, visit www.livetraffic.com, download Live Traffic App or call the Transport Management Centre on 132 701.

Media: Gareth Ward 0401 499 933 or Ben Blackburn 0423 466 358

View the original media release (PDF)


Share this page: