Kerb and Gutter (R15)

The Model (Road) Drawings show standard details of components and construction techniques to be used in roadworks on Roads and Maritime Services -funded infrastructure or infrastructure that will become the property of Roads and Maritime Services in the future. Model Drawings are referenced in Roads and Maritime Services Roadworks Specifications and may form part of tender documents for Roadworks Contracts let by Roads and Maritime Services.

Comments, queries or suggestions about Model Drawings can be sent by email to ModelDrawings@rms.nsw.gov.au.

MD.R15.A01.A.2 - Standard Kerb and Gutter shapes (S381)

MD.R15.A01.A.2 - Standard Kerb and Gutter shapes (S381)

MD.R15.A02.B - Kerb Type SA, SF and SM for Rigid Pavement (S368)

MD.R15.A02.B - Kerb Type SA, SF and SM for Rigid Pavement (S368)

MD.R15.A04.A - Gutter Type SK for Rigid Pavement

MD.R15.A04.A - Gutter Type SK for Rigid Pavement

MD.R15.A05.A - Dished Crossing for Minor Street Junctions and Access Roads (S367)

MD.R15.A05.A - Dished Crossing for Minor Street Junctions and Access Roads (S367)

MD.R15.A07.A - Cycleway Median Nose Treatment (S377)

MD.R15.A07.A - Cycleway Median Nose Treatment (S377)

MD.R15.A08.B - Standard Vehicular Channel Crossing for Use with Type SA Kerb and Channel

MD.R15.A08.B - Standard Vehicular Channel Crossing for Use with Type SA Kerb and Channel

MD.R15.B01.A - Kerb Transition Type SA Kerb to Type SF Kerb (S371)

MD.R15.B01.A - Kerb Transition Type SA Kerb to Type SF Kerb (S371)

MD.R15.B04.A - Kerb Transition Type SE to Type SK (S373)

MD.R15.B04.A - Kerb Transition Type SE to Type SK (S373)

MD.R15.B06.A - Kerb Transition Type SE to Concrete Pavement

MD.R15.B06.A - Kerb Transition Type SE to Concrete Pavement

MD.R15.B08.A - Kerb Transition Type SK to Type SA (S372)

MD.R15.B08.A - Kerb Transition Type SK to Type SA (S372)

MD.R15.B09.A - Kerb Transition Type SM to Type SF (S369)

MD.R15.B09.A - Kerb Transition Type SM to Type SF (S369)

Share this page: