Archived project documents

Updated community liaison plan

November 2013

November 2013 community liaison plan

Updated community liaison plan

November 2013

November 2013 community liaison plan

Updated community liaison plan

September 2012

September 2012 community liaison plan

December 2010 community liaison plan

December 2010

December 2010 community liaison plan

July 2010 Community liaison plan

July 2010

July 2010 Community liaison plan

September 2012

Project manager's update - September 2012.

September 2012

Project manager's update - September 2012.

June 2012

Project manager's update - June 2012.

March 2012

Project manager's update - March 2012.

January 2012

Project manager's update - January 2012.

December 2011

Project manager's update - December 2011.

November 2011 no.2

November 2011 no.2

November 2011 no.1

Project manager's update - November 2011 no.1.

October 2011

Project manager's update - October 2011.

August 2011 no.3

Project manager's update - August 2011 no.3.

August 2011 no.2

Project manager's update - August 2011 no.2.

August 2011 no.1

Project manager's update - August 2011 no.1.

July 2011

Project manager's update - July 2011.

June 2011

Project manager's update - June 2011.

May 2011

Project manager's update - May 2011.

April 2011

Project manager's update - April 2011.

March 2011 no.2

Project manager's update - March 2011 no.2.

March 2011 no.1

Project manager's update - March 2011 no.1.

February 2011

Project manager's update - February 2011.

Draft route options community feedback report

October 2012

Draft report of the community feedback received on the display of the Route Options Development Report.

Online business survey report

June 2011

This is a report of an online survey of businesses conducted with the co-operation of the Grafton Chamber of Commerce and Industry (GCCI). The survey was open between Thursday 14 April and Tuesday 3 May.

Telephone survey report

May 2011

Telephone survey of Clarence Valley residents between 14 and 21 March 2011.

Postal survey feedback report

April 2011

Postal survey December 2010 to March 2011 Feedback report

Additional crossing of the Clarence River - community suggestions map

February 2011

Additional crossing of the Clarence River - community suggestions map

Additional crossing of the Clarence river at Grafton - Summary of postal survey feedback

February 2011

Additional crossing of the Clarence river at Grafton - Summary of postal survey feedback

December 2010 initial community survey (extract from December 2010 community update)

December 2010

December 2010 initial community survey (extract from December 2010 community update)

Feasibility Assessment Report, June 2011 (main report)

June 2011

Feasibility assessment report on the 41 suggestions. Due to the size of appendix C, Feasibility assessment summary sheets, this section of the report is not available on the project website. Please contact the project team to obtain a copy.

Feasibility Assessment Report, Appendix A

June 2011

Route suggestions.

Feasibility Assessment Report, Appendix B

June 2011

Route suggestions shown in strategic corridors.

Feasibility Assessment Report, Appendix D

June 2011

Feasibility assessment workshop outcomes.

Feasibility Assessment Report, Appendix E

June 2011

Comparative strategic cost estimates.

March 2011 heavy vehicle traffic study summary

March 2011

March 2011 heavy vehicle traffic study summary

March 2011 heavy vehicle traffic study

March 2011

March 2011 heavy vehicle traffic study

Summary of community discussions February 2010 to November 2010

January 2011

Summary of community discussions February 2010 to November 2010

Traffic Study Brief for 2009 Investigation

December 2008

Traffic Study Brief for 2009 Investigation

Variations to Traffic Study Brief

January 2009

Variations to Traffic Study Brief

South Grafton Traffic Study Brief

July 2007

South Grafton Traffic Study Brief

May 2010 Community consultation report

May 2010

May 2010 Community consultation report

February 2010 traffic study report

February 2010

February 2010 traffic study report

December 2009 traffic study report

December 2009

December 2009 traffic study report

February 2009 South Grafton Traffic study report

February 2009

February 2009 South Grafton Traffic study report

2005 Draft preferred option report part 1

June 2005

The purpose of this draft report was to recommend a preferred location for an additional crossing of the Clarence River at Grafton. This draft report did not receive Roads and Maritime Services (formerly Roads and Traffic Authority) corporate endorsement and was not considered by the then Minister for Roads. It is available for your reference as background information to the current investigations. It has been divided into seven parts to make it easier to download and view.

2005 Draft preferred option report part 2

June 2005

Second part of the draft Preferred option report.

2005 Draft preferred option report part 3

June 2005

Third part of the draft Preferred option report.

2005 Draft preferred option report part 4

June 2005

Fourth part of the draft Preferred option report.

2005 Draft preferred option report part 5

June 2005

Fifth part of the draft Preferred option report.

2005 Draft preferred option report part 6

June 2005

Sixth part of the draft Preferred option report.

2005 Draft preferred option report part 7

June 2005

Final part of the draft Preferred option report.

2004 Corridor Evaluation workshop report

April 2004

2004 Corridor Evaluation workshop report

2004 Interim community consultation report – full report

January 2004

2004 Interim community consultation report – full report

2004 Interim community consultation report – executive summary

January 2004

2004 Interim community consultation report – executive summary

2003 Community Consultation Plan

September 2003

2003 Community Consultation Plan

February 2003 Feasibility study report

February 2003

February 2003 Feasibility study report

Technical Review of Inland Corridor Question and Answer Sheet

September 2006

Technical Review of Inland Corridor Question and Answer Sheet

Technical review of Inland Corridor report September 2006

September 2006

Technical review of Inland Corridor report September 2006

Technical review of Inland Corridor report appendix A

September 2006

Technical review of Inland Corridor report appendix A

Technical review of Inland Corridor report appendix B (page 1 to 15)

September 2006

Technical review of Inland Corridor report appendix B (page 1 to 15)

Technical review of Inland Corridor report appendix B (page 16 to 19)

September 2006

Technical review of Inland Corridor report appendix B (page 16 to 19)

Technical review of Inland Corridor report appendix B (page 20 to 22)

September 2006

Technical review of Inland Corridor report appendix B (page 20 to 22)

Technical review of Inland Corridor report appendix B (page 23)

September 2006

Technical review of Inland Corridor report appendix B (page 23)

Technical review of Inland Corridor report appendix C

September 2006

Technical review of Inland Corridor report appendix C

Technical review of Inland Corridor report appendix D

September 2006

Technical review of Inland Corridor report appendix D

Volume 1 Environmental overview

January 2004

Volume 1 Environmental overview

Volume 2 Appendix A Project legal and zoning issues

December 2003

Volume 2 Appendix A Project legal and zoning issues

Volume 2 Appendix B Community Participation Report

January 2004

Volume 2 Appendix B Community Participation Report

Volume 2 Appendix C Traffic Study and Economic Analysis

December 2003

Volume 2 Appendix C Traffic Study and Economic Analysis

Volume 2 Appendix D Land Use Issues

January 2004

Volume 2 Appendix D Land Use Issues

Volume 2 Appendix E Social and Economic Impacts Report

January 2004

Volume 2 Appendix E Social and Economic Impacts Report

Volume 2 Appendix F Geotechnical Investigation Report

November 2003

Volume 2 Appendix F Geotechnical Investigation Report

Volume 2 Appendix G Hydrology

November 2003

Volume 2 Appendix G Hydrology

Volume 2 Appendix H Water Quality Assessment

December 2003

Volume 2 Appendix H Water Quality Assessment

Volume 2 Appendix I Ecological assessment

December 2003

Volume 2 Appendix I Ecological assessment

Volume 2 Appendix J Non-Indigenous Heritage Assessment

December 2003

Volume 2 Appendix J Non-Indigenous Heritage Assessment

Volume 2 Appendix K Indigenous Heritage Assessment

January 2004

Volume 2 Appendix K Indigenous Heritage Assessment

Volume 2 Appendix L Noise Assessment

December 2003

Volume 2 Appendix L Noise Assessment

Volume 2 Appendix M Air Quality Assessment

December 2003

Volume 2 Appendix M Air Quality Assessment

Volume 2 Appendix N Short Listing Workshop

November 2003

Volume 2 Appendix N Short Listing Workshop

Statement of heritage impact (March 2005)

March 2005

Statement of heritage impact (March 2005)

Project flowchart - August 2014

August 2014

Project flowchart - August 2014

Key features map

August 2014

Key features map - August 2014

Share this page: