Project documents

Operational Phase Fauna Monitoring Year 2 - Grey's Dam Frog Pipes

August 2016

Giant Barred Frog (Mixophyes iteratus) Operational Phase Monitoring Program

July 2016

Progress Report: Nest Box Monitoring Operational Phase, Year 1 (2015)

June 2016

Threatened Flora Monitoring Annual Report 5

March 2016

Post operational noise information session summary

September 2015

Summary of the outcomes of the three community information sessions held about the post operational noise report

Noise summary information sheet

August 2015

Summary on the noise assessment and outcomes of the post-construction operational noise report

Question and answer information sheet

August 2015

Questions and answers about noise and the operational noise assessment

Post-construction operation noise report, main report

August 2015

An assessment of operational noise on the project

Post-construction operation noise report, appendix E maps (part 1)

August 2015

Residents identified for treatment (Sapphire to Moonee)

Post-construction operation noise report, appendix E maps (part 2)

August 2015

Residents identified for treatment (Emerald Beach to south of Bypass)

Post-construction operation noise report, appendix E maps (part 3)

August 2015

Residents identified for treatment (Woolgoolga Bypass)

Post-construction operation noise report, appendix G

August 2015

Noise monitoring results

Noise workshop summary report, Main report

October 2014

Summary of the September community workshops and community feedback, including a list of final noise monitoring locations.

Post-opening noise monitoring plan, Appendix A (part 1)

October 2014

Report prepared by Renzo Tonin providing details on the noise monitoring plan, including monitoring locations.

Post-opening noise monitoring plan, Appendix A (part 2)

October 2014

Maps prepared by Renzo Tonin providing details on the noise monitoring locations.

Workshop presentations, Appendix B

September 2014

Presentation by Roads and Maritime project manager Col Solomon and presentation by Dr Michael Chung from Renzo Tonin.

Community feedback, Appendix C

October 2014

Community feedback received at the September workshops.

Shared cycleway plans

August 2014

View or download the project map.

Letter to advise of changed arrangements

August 2014

Proposal to extend Saturday hours

Letter to advise of changed traffic arrangements

July 2014

Changes to traffic in the vicinity of the new highway and Opal Boulevard intersection at Korora.

Letter to advise of changed traffic arrangements June 2014

June 2014

Changes to traffic in the vicinity of Sapphire Beach

Letter to advise of work to complete local road to Old Coast Road overpass

May 2014

Completion of local road link includes work on Hunters Close and Old Coast Road

Letter to advise of changed traffic arrangements

May 2014

Changes to traffic in the vicinity of Woolgoolga

Letter to advise of out of hours work

May 2014

Extension of working hours granted

Letter to advise of changed traffic arrangements

April 2014

Changes to traffic in the vicinity of Woolgoolga.

Letter to advise of changed traffic arrangements

April 2014

Changes to traffic in the vicinity of Woolgoolga.

Letter to advise of changed traffic arrangements

April 2014

Changes to traffic in the vicinity of Woolgoolga. (Graham Drive)

Letter to advise of changed traffic arrangements

April 2014

Changes to traffic in the vicinity of Woolgoolga. (Graham Drive)

Letter to advise of laying the low noise pavement

April 2014

Changes to traffic in the vicinity of Emerald Beach and Sandy Beach.

Letter to advise of laying the low noise pavement

April 2014

Changes to traffic in the vicinity of Emerald Beach and Sandy Beach.

Change traffic arrangements notification

April 2014

Southern tie-in at Korora to Sapphire Beach interchange

Map of changed traffic arrangements

April 2014

Description: Southern tie-in at Korora to Sapphire Beach interchange

Change traffic arrangements notification

April 2014

Smiths Road to South Woolgoolga

Map of changed traffic arrangements

April 2014

Map of changed traffic arrangements

Change traffic arrangements notification

April 2014

Sapphire Beach interchange to Graham Drive (south) Emerald Beach

Map of changed traffic arrangements

April 2014

Sapphire Beach interchange to Graham Drive (south) Emerald Beach

Letter to residents regarding OOH work

March 2014

Letter regarding OOH asphalt work

Letter to residents regarding OOH work

March 2014

Letter regarding OOH asphalt work

Letter to residents regarding the batch plant

March 2014

Letter regarding out of hours work at the asphalt batch plant

Letter to residents regarding the batch plant

March 2014

Letter regarding out of hours work at the asphalt batch plant

Letter to residents regarding access at Korora

March 2014

Letter advising of changed access arrangements at Korora

Letter to residents regarding access at Korora

March 2014

Letter advising of changed access arrangements at Korora

Letter to residents regarding changed traffic arrangements

March 2014

Letter notifying of a number of upcoming traffic switches to finish the project

Letter to residents regarding changed traffic arrangements

March 2014

Letter notifying of a number of upcoming traffic switches to finish the project

Letter to residents regarding out of hours work

March 2014

Description: Proposed night work between Korora and Woolgoolga

Letter to residents regarding out of hours work

March 2014

Description: Proposed night work between Korora and Woolgoolga

Letter to residents regarding Arrawarra interchange

February 2014

Letter advising of change traffic arrangements at the Arrawarra interchange, Arrawarra.

Letter to residents regarding Arrawarra interchange

February 2014

Letter advising of change traffic arrangements at the Arrawarra interchange, Arrawarra.

Letter to residents regarding Moonee beach traffic switch

January 2014

Letter advising of change traffic arrangements at Moonee Beach Road, Moonee Beach

Letter to residents regarding Moonee beach traffic switch

January 2014

Letter advising of change traffic arrangements at Moonee Beach Road, Moonee Beach

Letter to residents regarding changed traffic arrangements

January 2014

Letter advising of change traffic arrangements at Sugarmill Road, Sapphire

Letter to residents regarding changed traffic arrangements

January 2014

Letter advising of change traffic arrangements at Sugarmill Road, Sapphire

Letter to residents regarding the Woolgoolga bypass

December 2013

Letter advising of traffic arrangements following the opening of Woolgoolga bypass

Letter to residents regarding extension to current approved working hours

November 2013

Letter to residents regarding extension to current approved working hours

Letter to residents regarding extension to current approved working hours

November 2013

Letter to residents regarding extension to current approved working hours

Letter to resident regarding finishing works

November 2013

Letter advising of finishing works in the vicinity of Headland Road, Sapphire Beach

Letter to residents regarding finishing works

November 2013

Letter advising of finishing works in the vicinity of Headland Road, Sapphire Beach

Letter to residents regarding drainage

November 2013

Letter advising of drainage and profiling works near Sapphire Beach

Letter to resident regarding drainage

November 2013

Letter advising of drainage and profiling works near Sapphire Beach

Letter to residents regarding Graham Drive overpass and south Woolgoolga approaches traffic switch

November 2013

Letter advising the new Graham Drive (north) overpass and approaches at south Woolgoolga will open to local traffic from late Saturday 23 November.

Letter to residents regarding Graham Drive overpass and south Woolgoolga approaches traffic switch

November 2013

Letter advising the new Graham Drive (north) overpass and approaches at south Woolgoolga will open to local traffic from late Saturday 23 November.

Letter to residents regarding opening of local service road

November 2013

Letter to residents regarding the opening the local service from Maccues Road to Moonee Beach overpass.

Letter to residents regarding opening of local service road

November 2013

Letter to residents regarding the opening the local service from Maccues Road to Moonee Beach overpass.

Letter to residents regarding traffic switch

October 2013

Letter to residents regarding changed traffic arrangements between Korora and Sapphire

Community information session meeting notes

August 2013

Meeting notes from the community information sessions held on 24 August 2013 at Emerald Beach.

Community information session meeting notes

August 2013

Meeting notes from the community information sessions held on 24 August 2013 at Emerald Beach.

Letter to residents regarding changed traffic conditions at Sandy Beach

October 2013

Letter to residents regarding temporary closure of the Grahame Drive (north) and Pacific Highway intersection, Sandy Beach.

Letter to residents regarding changed traffic conditions at Sandy Beach

October 2013

Letter to residents regarding temporary closure of the Grahame Drive (north) and Pacific Highway intersection, Sandy Beach.

Letter to residents regarding Emerald Beach to Sandy Beach

October 2013

Letter advising of changed access arrangements from Fiddaman Road to Graham Drive (south).

Letter to residents regarding Emerald Beach to Sandy Beach

October 2013

Letter advising of changed access arrangements from Fiddaman Road to Graham Drive (south).

Letter to residents regarding Split Solitary Road

September 2013

Letter to residents advising of changed traffic arrangements near Split Solitary Road.

Letter to residents regarding Split Solitary Road

September 2013

Letter to residents advising of changed traffic arrangements near Split Solitary Road.

Map advising of Split Solitary Rd Stage One and Two arrangements

September 2013

Map of Stages One and Two changed traffic arrangements near Split Solitary Road.

Letter to residents regarding Moonee Beach overpass opening

September 2013

Opening of the Moonee Beach overpass to traffic.

Letter to residents regarding Moonee Beach overpass opening

September 2013

Opening of the Moonee Beach overpass to traffic.

Map to advise of changed traffic conditions at Moonee Beach overpass

September 2013

Map of temporary changed traffic conditions at Moonee Beach overpass.

Letter to residents regarding Smiths Road bridge opening

September 2013

Opening of Smiths Road bridge to traffic

Letter to residents regarding Smiths Road bridge opening

September 2013

Opening of Smiths Road bridge to traffic

Map to advise of changed traffic conditions at Smiths Road bridge

September 2013

Map of temporary changed traffic conditions at Smiths Road bridge.

Letter to Residents regarding Asphalt Batching Plant

August 2013

Establishment of the Asphalt Batching Plant at Bark Hut Rd site compound, Woolgoolga.

Letter to Residents regarding Asphalt Batching Plant

August 2013

Establishment of the Asphalt Batching Plant at Bark Hut Rd site compound, Woolgoolga.

Letter to residents regarding work at Headlands Road

August 2013

Opening of the local road tie-in works at Headland Road, Sapphire Beach

Letter to residents regarding work at Headlands Road

August 2013

Opening of the local road tie-in works at Headland Road, Sapphire Beach

Letter to residents regarding changed access arrangements at Emerald Heights / Sandy Beach

August 2013

Changed access arrangements at Emerald Heights Drive and Graham Drive (south)

Letter to residents regarding changed access arrangements at Emerald Heights / Sandy Beach

August 2013

Changed access arrangements at Emerald Heights Drive and Graham Drive (south)

Letter to advise of U-turn bay temporary closure

June 2013

Temporary closure of U-turn bay at Sapphire Beach

Letter to advise of U-turn bay temporary closure

June 2013

Temporary closure of U-turn bay at Sapphire Beach

Letter regarding girder transportation and temporary impacts to park

June 2013

Temporary impact to parking at Isles Industrial Estate, Coffs Harbour.

Letter regarding girder transportation and temporary impacts to park

June 2013

Temporary impact to parking at Isles Industrial Estate, Coffs Harbour.

Letter to advise of traffic switch

May 2013

From Sunday 2 June, a traffic switch will take place between Graham Drive (south) to about 200 metres north of Hearnes Lake Road.

Letter to advise of temporary arrangements at Seaview Close and Campbell Close

May 2013

Changed access arrangements at Seaview Close and Campbell Close, Korora.

Letter to advise of temporary arrangements at Smiths Road intersection

May 2013

Smiths Road intersection with the Pacific Highway to include a temporary right turn facility from 19 May.

Letter to advise of temporary arrangements at Smiths Road intersection

May 2013

Smiths Road intersection with the Pacific Highway to include a temporary right turn facility from 19 May.

Letter to advise of major traffic switch

May 2013

From Sunday 19 May, a traffic switch will take place between Sugarmill Road at Sapphire Beach and Graham Drive south at Sandy Beach.

Letter to advise of changed traffic arrangements at Bark Hut Road

April 2013

Bark Hut Road overpass will be open to local traffic from 29 April 2013.

Letter to advise of changed traffic arrangements at Bark Hut Road

April 2013

Bark Hut Road overpass will be open to local traffic from 29 April 2013.

Letter to advise of changed traffic arrangements at Korara and Sapphire Beach

April 2013

Headland Road overpass at Sapphire Beach will be open to local traffic week commencing 29 April 2013.

Letter to advise of changed traffic arrangements at Korara and Sapphire Beach

April 2013

Headland Road overpass at Sapphire Beach will be open to local traffic week commencing 29 April 2013.

Letter and feedback form for extended working hours

April 2013

The project team are seeking feedback on extended working hours in locations identified in the letter.

Letter and feedback form for extended working hours

April 2013

The project team are seeking feedback on extended working hours in locations identified in the letter.

Letter to advise of work at Bucca Road bus interchange facility

April 2013

Changed arrangements will be in place from week commencing 29 April for the school bus facility on Bucca Road, Moonee.

Letter to advise of work at Bucca Road bus interchange facility

April 2013

Changed arrangements will be in place from week commencing 29 April for the school bus facility on Bucca Road, Moonee.

Letter to advise of extended out of hours work

March 2013

Approval has been granted for the joint venture to continue working out of hours on Saturdays for a further six months, from Saturday 23 March 2013 until Saturday 28 September 2013.

Letter to advise of extended out of hours work

March 2013

Approval has been granted for the joint venture to continue working out of hours on Saturdays for a further six months, from Saturday 23 March 2013 until Saturday 28 September 2013.

Letter to residents to advise of change traffic arrangements at Woolgoolga Creek Road overpass

March 2013

Residents are advised the overpass over the new highway at Woolgoolga Creek Road, west of Woolgoolga, will be opened to traffic.

Letter to residents to advise of change traffic arrangements at Woolgoolga Creek Road overpass

March 2013

Residents are advised the overpass over the new highway at Woolgoolga Creek Road, west of Woolgoolga, will be opened to traffic.

Letter to residents to advise of changed access arrangements for Arrawarra Beach Road intersection

February 2013

Residents will need to access the highway via the northern intersection with Eggins Drive.

Letter to residents to advise of changed access arrangements for Arrawarra Beach Road intersection

February 2013

Residents will need to access the highway via the northern intersection with Eggins Drive.

Letter to residents to advise of temporary changed access arrangements for Tiki Road

January 2013

The intersection of Tiki Road and the Pacific Highway will be relocated back to the original intersection location.

Letter to residents to advise of temporary changed access arrangements for Tiki Road

January 2013

The intersection of Tiki Road and the Pacific Highway will be relocated back to the original intersection location.

Letter to residents to advise of changed access arrangements for Arrawarra Beach Road intersection

January 2013

Residents will need to access the highway via the northern intersection with Eggins Drive.

Letter to residents to advise of changed access arrangements for Arrawarra Beach Road intersection

January 2013

Residents will need to access the highway via the northern intersection with Eggins Drive.

Letter to residents to advise of changed access arrangements on Sugarmill Road

January 2013

The u-turn bay at Sugarmill Road, North Sapphire, will be permanently removed.

Letter to residents to advise of temporary opening of Diamond Head Drive overpass

December 2012

The new overpass on Diamond Head Drive at Sandy Beach will be temporarily opened to two-way traffic flow.
Available on request - please contact us.

Letter to advise of opening of the service road between Wakelands Road and Maccues Road

November 2012

The service road between Wakelands Road and Maccues Road, Moonee Beach will be opened from week commencing 3 December 2012.
Available on request - please contact us.

Letter to residents

November 2012

Letter to residents regarding Christmas/new year and upcoming works over the next six months.
Available on request - please contact us.

Letter to residents regarding changed traffic arrangements

November 2012

Temporary changed access arrangements at Sapphire Pines and Sapphire House, Sapphire Beach.
Available on request - please contact us.

Letter to advise of temporary changed access arrangements at Moonee Beach Road

October 2012

Temporary changed access arrangements at Moonee Beach Road, Moonee Beach.
Available on request - please contact us.

Letter to advise of temporary changed access arrangements at Seaview Close and Campbell Close

October 2012

Temporary changed access arrangements at Seaview Close and Campbell Close, Korora.
Available on request - please contact us.

Letter to advise of opening of the service road between Gaudrons Road and Sugarmill Road

October 2012

Opening of the service road between Gaudrons Road and Sugarmill Road, Sapphire.
Available on request - please contact us.

Letter to residents regarding changed traffic arrangements

October 2012

The realigned Palmer Road will be open to traffic.
Available on request - please contact us.

Letter to residents regarding changed traffic arrangements

October 2012

Temporary changed access arrangements at Sapphire Pines and Sapphire House, Sapphire Beach.
Available on request - please contact us.

Letter to advise of temporary changed access arrangements

October 2012

Staged traffic arrangements will be in place at Hearnes Lake Road, Woolgoolga.
Available on request - please contact us.

Letter to advise of temporary changed access arrangements

October 2012

Temporary changed access arrangements will be in place at Opal Boulevard, Korora.
Available on request - please contact us.

Letter to businesses at Isles Industrial Estate, Coffs Harbour

October 2012

Temporary impact on parking on the Isles Industrial Estate, Coffs Harbour.
Available on request - please contact us.

Letter to advise of temporary changed access arrangements at Headland's Road

September 2012

Traffic that usually accesses the highway via Headland Road will be diverted onto a temporary sidetrack between Warrawee Street and the Pacific Highway.
Available on request - please contact us.

Letter to advise of new school bus facility

September 2012

New school bus facility to open at Bucca Road, Moonee.
Available on request - please contact us.

Letter to residents to advise of temporary changed access arrangements

August 2012

Temporary changed access arrangements at Sapphire Pines and Sapphire House, Sapphire Beach.
Available on request - please contact us.

Letter to residents regarding Tiki Road

August 2012

Letter to residents regarding an upcoming meeting and changed traffic arrangements at Tiki Road.
Available on request - please contact us.

Controlled blasting at Graham Drive south, Emerald Heights

August 2012

Letter to residents to advise of upcoming blast and change traffic arrangements.
Available on request - please contact us.

Controlled blasting at Graham Drive south, Emerald Heights

August 2012

Letter to residents within the blasting exclusion zone.
Available on request - please contact us.

Media release - Demolition of the Diamond Head Drive overpass, Sandy Beach

August 2012

Roads and Maritime Services advise of traffic arrangements in place on Saturday 11 and Sunday 12 August.
Available on request - please contact us.

Letter to residents regarding demolition works for the existing Diamond Head Drive overpass

August 2012

Letter to residents regarding heavy vehicle delays on the Pacific Highway and a light vehicle detour for the demolition of the existing Diamond Head Drive overpass on Saturday 11 and Sunday 12 August.
Available on request - please contact us.

Map to advise of temporary traffic arrangements on the Pacific Highway, Sandy Beach

August 2012

Temporary closure of the Pacific Highway and light vehicle detour at Diamond Head Drive, Sandy Beach.
Available on request - please contact us.

Letter to residents regarding changed traffic arrangements on the Pacific Highway at Headlands Road, Sapphire Beach.

July 2012

Letter to residents regarding a concrete pour at Headlands Road and changed access arrangements on the Pacific Highway.
Available on request - please contact us.

Letter to residents regarding changed traffic arrangements at Diamond Head Drive

July 2012

Letter to residents regarding the opening of the northern section of the new Diamond Head Drive overpass, Sandy Beach.
Available on request - please contact us.

Letter to residents regarding changed access arrangements at Sapphire Pines and Sapphire House

July 2012

Temporary changed access arrangements at Sapphire Pines and Sapphire House, Sapphire Beach.
Available on request - please contact us.

Media release - July staffed displays and upcoming changed traffic arrangements

July 2012

Roads and Maritime Services advise that staffed displays will be held on 20 and 21 July to discuss the temporary redirection of traffic for the intersection of Arrawarra Beach Road, Arrawarra.
Available on request - please contact us.

Letter to residents regarding out of hours saw cutting

July 2012

Letter to residents regarding out of hours saw cutting of concrete pavements.
Available on request - please contact us.

Letter to residents regarding staffed displays and the changed traffic arrangements

July 2012

Letter to residents regarding staffed displays and the temporary redirection of traffic for the intersection of Arrawarra Beach Road, Arrawarra.
Available on request - please contact us.

Letter to residents regarding changed access arrangements at Headlands Road

June 2012

Temporary traffic changes to the Pacific Highway and changed access arrangements at Headlands Road, Sapphire Beach.
Available on request - please contact us.

Letter to residents advising of changed access arrangements

June 2012

Temporary changed access arrangements at Killara Avenue, Heritage Park Estate, Moonee, from June.
Available on request - please contact us.

Letter to residents to regarding community information session

June 2012

A community information session will be held on 20 June at The Pines Residential Village.
Available on request - please contact us.

Media release - May 2012 controlled blast cancelled

May 2012

Roads and Maritime Services advise that the controlled blast scheduled for May 2012 is cancelled.
Available on request - please contact us.

Letter to residents advising of controlled blast

May 2012

Controlled blasting to occur between Seaview Close and Campbell Close, Sapphire Beach in May 2012.
Available on request - please contact us.

Media release - Asbestos removal continues

May 2012

Asbestos removal from an old unused council water main along the upgrade is planned for 11 and 14 May 2012.
Available on request - please contact us.

Letter to advise of Saturday afternoon works

May 2012

Work conducted out of normal hours to undertake concrete pour at Diamond Head Drive, Sandy Beach.
Available on request - please contact us.

Media release - Concrete pour at Diamond Head Drive, Sandy Beach

May 2012

Roads and Maritime Services advise of changed traffic arrangements on the Pacific Highway at Diamond Head Drive, Sandy Beach.
Available on request - please contact us.

Media release - Sapphire to Woolgoolga community information sessions

April 2012

Roads and Maritime Services advise of upcoming Sapphire to Woolgoolga community information sessions on 26 May 2012.
Available on request - please contact us.

Letter to residents regarding changed access arrangements

April 2012

Temporary closure of the intersection of Blackbutt Avenue and Diamond Head Drive, Sandy Beach.
Available on request - please contact us.

Letter to residents regarding controlled blasting

March 2012

Controlled blasting to occur west of Woolgoolga from April 2012.
Available on request - please contact us.

Letter to residents regarding changed access arrangements

March 2012

Temporary changed access arrangements between Old Bucca Road and Hoys Road from April.
Available on request - please contact us.

Map of change access arrangements

March 2012

Map of temporary changed access arrangements for Old Bucca Road.
Available on request - please contact us.

Letter to residents to advise of early morning works

March 2012

Work conducted out of normal hours to undertake concrete pour at Graham Drive North, Wollgoolga
Available on request - please contact us.

Letter to residents regarding changed access arrangements

March 2012

Changed access arrangements at Hunter Close and Old Coast Road, Sapphire Beach.
Available on request - please contact us.

Temporary changed access arrangements at Palmer and Bark Hut Road, west of Woolgoolga

December 2011

Temporary changed access arrangements at Palmer and Bark Hut Road, west of Woolgoolga to occur in early January 2012. Includes a map.
Available on request - please contact us.

Out of hours work for the project extended

November 2011

Approval has been granted for out of hours work to continue on the project until April 2012.
Available on request - please contact us.

Media release - design refinements on display

November 2011

Roads and Maritime Services advise that the design refinements for the project are now on display at various locations along the project.
Available on request - please contact us.

Partial closure of Diamond Head Drive

October 2011

The partial closure of the Diamond Head Drive bridge over the Pacific Highway to a single lane, from Monday 10 October until the new bridge is completed in 2012.
Available on request - please contact us.

Controlled blasting information presentation

August 2011

Controlled blasting information presentation presented at the information sessions held 17 and 20 August 2011.
Available on request - please contact us.

Controlled blasting information sessions

August 2011

Controlled blasting information sessions to be held 17 and 20 August 2011.
Available on request - please contact us.

Noise walls to be installed at Emerald heights

July 2011

Media release regarding noise walls to be installed at Emerald heights.
Available on request - please contact us.

Out of hours work at Unwins Road

June 2011

Out of hours concrete pour for Unwins Road underpass. Nightwork scheduled to be carried out on Thursday 14 July 2011 between 6pm and 7am, weather permitting.
Available on request - please contact us.

Proposed design refinements at Moonee Beach

June 2011

Proposed design refinements at Moonee Beach Road. Inviting comment until Friday 8 July 2011.
Available on request - please contact us.

Controlled blasting information sheet

May 2011

Controlled blasting information sheet for the project.
Available on request - please contact us.

Design refinements meeting notes

May 2011

Meeting notes, design refinements meeting held on 4 May 2011.
Available on request - please contact us.

Design refinements meeting

May 2011

Design refinements meeting 4 May 2011 - presentation.
Available on request - please contact us.

Proposed design refinements

April 2011

Sapphire to Woolgoolga - proposed design refinements.
Available on request - please contact us.

Relocation of letter boxes in Sapphire Beach

February 2011

Due to earthwork activities being undertaken in the area of Sapphire Beach, there is a need to relocate some private letter boxes.
Available on request - please contact us.

Controlled blasting, south Woolgoolga

January 2011

Controlled blasting is required in two cuttings on the Woolgoolga bypass section of the project.
Available on request - please contact us.

Relocation of community display centre, Emerald Beach

December 2010

The community display centre will be relocated to the main site compound at Emerald Beach. Map attached.
Available on request - please contact us.

Temporary stockpiling of topsoil

November 2010

Topsoil that is stripped during construction is proposed to be temporarily stockpiled at a number of locations adjacent to the project.
Available on request - please contact us.

Temporary relocation of Gaudrons Road bus stop

November 2010

The existing bus stop at the intersection of Gaudrons Road and the highway will be temporarily relocated to enable construction to proceed around the area at Sapphire.
Available on request - please contact us.

Repair works to sections of the highway – night works

November 2010

Carry out repair works to damaged sections of the existing highway before the busy Christmas period.
Available on request - please contact us.

Noise fact sheet

October 2010

'At residence noise mitigation treatment’ fact sheet for the project.
Available on request - please contact us.

Site office establishment at Hoys Road, Moonee

October 2010

A site compound is proposed to be established at Hoys Road, Moonee. Map attached.
Available on request - please contact us.

Proposed extension of hours at various sections along the project

October 2010

The working hours are proposed to be extended for about five months until Saturday 2 April 2011 (daylight saving).
Available on request - please contact us.

Proposed batch plant establishment Graham Drive north, Woolgoolga

September 2010

Construction of a batch plant is proposed to be established at Graham Drive north, Woolgoolga. Construction to commence in January 2011. - View map.
Available on request - please contact us.

First stage of site office at Emerald Beach complete

September 2010

The first stage of the site office is complete. Construction of stage two is now set to start.
Available on request - please contact us.

Closure of existing lanes on the Pacific Highway at various locations

September 2010

Closing existing overtaking lanes on the highway at Bucca Road and Cunninghams Creek, Moonee and Killara Avenue and Smiths Road, opposite Heritage Park Estate.
Available on request - please contact us.

Proposed design refinements at Seaview Close and Campbell Close

August 2010

The joint venture is investigating a number of possible design refinements to the approved concept design in the Campbell Close area at Sapphire. As part of the design refinements, improvements to the Seaview Close area are also being considered. - View map.
Available on request - please contact us.

Site office establishment, North Sapphire Beach

August 2010

A permanent site office is proposed to be established at North Sapphire Beach. Map attached.
Available on request - please contact us.

Site office establishment, Bark Hut Road, Woolgoolga

August 2010

A permanent site office is proposed to be established at Bark Hut Road, Woolgoolga. Map attached.
Available on request - please contact us.

Site office establishment, Emerald Beach

July 2010

Update on the establishment of the project site office and project display centre at Fiddamen Road, Emerald Beach.
Available on request - please contact us.

Register interest in the project, July 2010

July 2010

Letter to those who registered an interest in the development of the Sapphire to Woolgoolga upgrade.
Available on request - please contact us.

Proposed site office establishment, Emerald Beach

May 2010

The main site office for the project is proposed to be established adjacent to the highway and approximately 400m south of Fiddaman Road, Emerald Beach. Map attached.
Available on request - please contact us.

Progress update, October 2011

October 2011

Proposed construction activities between October and December 2011.

Progress update, July 2011

July 2011 Proposed construction activities between July a

Proposed construction activities between July and September 2011.

Community Involvement Summary Report (Coffs Harbour City Council's Preferred Corridor), July 2004

July 2004

Community Involvement Summary Report (Coffs Harbour City Council's Preferred Corridor), July 2004
Available on request - please contact us.

Community Involvement Summary Report (Short-Listed Options), June 2004

June 2004

Community Involvement Summary Report (Short-Listed Options), June 2004
Available on request - please contact us.

Community Involvement Summary Report, May 2003

May 2003

Community Involvement Summary Report, May 2003
Available on request - please contact us.

Community Involvement Summary Report, September 2002

September 2002

Community Involvement Summary Report, September 2002
Available on request - please contact us.

Post construction noise monitoring program

September 2014

Renzo Tonin presentation at the workshops held on 16, 17 and 18 September 2014 on noise.

Post construction noise monitoring program

September 2014

The presentation at the workshops held on 16, 17 and 18 September 2014 on noise.

Community information session presentation

March 2014

The presentation from the community information sessions held on 1 March 2014 at Emerald Beach and Woolgoolga.

November community information session meeting notes

November 2013

Meeting notes from the community information session held at Emerald Beach 30 November 2013.

November community information session meeting notes

November 2013

Meeting notes from the community information session held at Emerald Beach 30 November 2013.

November 2013 community information session presentation

November 2013

Presentation at the community information session held at Emerald Beach 30 August 2013.

August community information session meeting notes

August 2013

Meeting notes from the community information sessions held on 24 August 2013 at Emerald Beach.

August community information session meeting notes

August 2013

Meeting notes from the community information sessions held on 24 August 2013 at Emerald Beach.

August 2013 community information session presentation

August 2013

Presentation at the community information session held at Emerald Beach 24 August 2013.

Community information session presentation

May 2013

The presentation from the community information sessions held on 25 May 2013 at Woolgoolga and Emerald Beach.

Community information session meeting notes

February 2013

Meeting notes from the community information sessions held on 23 February 2013 at Woolgoolga and Emerald Beach.

Community information session meeting notes

February 2013

Meeting notes from the community information sessions held on 23 February 2013 at Woolgoolga and Emerald Beach.

Community information session presentation

February 2013

The presentation from the community information sessions held on 23 February 2013 at Woolgoolga and Emerald Beach.

Community information session presentation

February 2013

The presentation from the community information sessions held on 23 February 2013 at Woolgoolga and Emerald Beach.

Community information session meeting notes

November 2012

Meeting notes from the community information sessions held on 24 November 2012 at Woolgoolga and Emerald Beach.
Available on request - please contact us.

Community information session meeting notes

November 2012

Meeting notes from the community information sessions held on 24 November 2012 at Woolgoolga and Emerald Beach.
Available on request - please contact us.

Community information session presentation

November 2012

The presentation from the community information sessions held on 24 November 2012 at Woolgoolga and Emerald Beach.
Available on request - please contact us.

Community information session meeting notes

August 2012

Meeting notes from the community information sessions held on 25 August 2012 at Woolgoolga and Emerald Beach
Available on request - please contact us.

Community information session presentation

August 2012

The presentation from the community information sessions held on 25 August 2012 at Woolgoolga and Emerald Beach.
Available on request - please contact us.

Community information session meeting notes

May 2012

Meeting notes from the community information sessions held on 26 May 2012 at Woolgoolga and Emerald Beach.
Available on request - please contact us.

Community information session presentation

May 2012

The presentation used at the community information sessions held on 26 May 2012 at Woolgoolga and Emerald Beach.
Available on request - please contact us.

Community information session meeting notes

February 2012

Meeting notes from the community information sessions held on 25 February 2012 at Woolgoolga and Emerald Beach.
Available on request - please contact us.

Community information session presentation

February 2012

The presentation used at the community information sessions held on Saturday, 26 February 2012.
Available on request - please contact us.

Community information session meeting notes

November 2011

Meeting notes from the community information sessions held on 26 November 2011 at Moonee Beach and Emerald Beach.
Available on request - please contact us.

Community information session presentation

November 2011

Presentation used at the community information sessions held on Saturday, 26 November 2011.
Available on request - please contact us.

Community information session

November 2011

Community information sessions to be held on 26 November 2011.
Available on request - please contact us.

Community information session meeting notes

August 2011

Meeting notes from the community information sessions held on 27 August 2011 at Emerald Beach and Moonee Beach.
Available on request - please contact us.

Community information session presentation

August 2011

The presentation used at the community information sessions held on Saturday, 27 August 2011.
Available on request - please contact us.

Community information session

August 2011

Community information session to be held 27 August 2011
Available on request - please contact us.

Community information sessions media release

August 2011

Media release for the community information sessions to be held on Saturday 27 August 2011.
Available on request - please contact us.

Community information session meeting notes

May 2011

Meeting notes, community information session Saturday 28 May 2011.
Available on request - please contact us.

Community information session presentation

May 2011

The presentation used at the community information sessions held on Saturday, 28 May 2011.
Available on request - please contact us.

Community information session meeting notes

February 2011

Meeting notes, community information session Saturday, 26 February 2011.
Available on request - please contact us.

Community information session presentation

February 2011

The presentation used at the community information sessions held on Saturday 26 February 2011.
Available on request - please contact us.

27 November, 2010

November 2010

Meeting notes. Community staffed display- 27 November, 2010
Available on request - please contact us.

27 November, 2010

November 2010

Community staffed display- 27 November, 2010
Available on request - please contact us.

Meeting notes, community information session

October 2010

Meeting notes taken at the information session held on 23 October 2010.
Available on request - please contact us.

Meeting notes, urban design and landscape workshops

October 2010

Urban design and landscape workshops held on 25 September 2010 and 23 October 2010 at Woolgoolga Community Village Hall and Moonee Beach Hall, with representatives of urban design and landscape consultants Tract and Jackson Teece
Available on request - please contact us.

23 October, 2010

October 2010

Community staffed display- 23 October, 2010
Available on request - please contact us.

25 September, 2010

September 2010

Community staffed display- 25 September, 2010
Available on request - please contact us.

28 August, 2010

August 2010

Community staffed display- 28 August, 2010
Available on request - please contact us.

S2W (South) - CFG-201, December 2007

December 2007

S2W (South) - CFG-201, December 2007
Available on request - please contact us.

S2W (North) - CFG-21, December 2006 [accepted December 2007]

December 2006

S2W (North) - CFG-21, December 2006 [accepted December 2007]
Available on request - please contact us.

S2W (North) - CFG-20, November 2006 [accepted December 2006]

November 2006

S2W (North) - CFG-20, November 2006 [accepted December 2006]
Available on request - please contact us.

S2W (South) - CFG-19, November 2006

November 2006

S2W (South) - CFG-19, November 2006
Available on request - please contact us.

S2W (North) - CFG-19, August 2006 [accepted December 2006]

August 2006

S2W (North) - CFG-19, August 2006 [accepted December 2006]
Available on request - please contact us.

S2W (North & South) - CFG-18, June 2006 [accepted December 2006]

June 2006

S2W (North & South) - CFG-18, June 2006 [accepted December 2006]
Available on request - please contact us.

S2W (South) - CFG-17, May 2005

May 2005

S2W (South) - CFG-17, May 2005
Available on request - please contact us.

S2W (North) - CFG-17, May 2005 [accepted December 2006]

May 2005

S2W (North) - CFG-17, May 2005 [accepted December 2006]
Available on request - please contact us.

S2W (South) - CFG-16, March 2005

March 2005

S2W (South) - CFG-16, March 2005
Available on request - please contact us.

S2W (North) - CFG-16, March 2005

March 2005

S2W (North) - CFG-16, March 2005
Available on request - please contact us.

S2W (North & South) - CFG-15, December 2004

December 2004

S2W (North & South) - CFG-15, December 2004
Available on request - please contact us.

S2W (North & South) - CFG-14, July 2004

July 2004

S2W (North & South) - CFG-14, July 2004
Available on request - please contact us.

S2W (North & South) - CFG-12, February 2004

February 2004

S2W (North & South) - CFG-12, February 2004
Available on request - please contact us.

S2W (North & South) - CFG-11, May 2003

May 2003

S2W (North & South) - CFG-11, May 2003
Available on request - please contact us.

S2W (South) - CFG-10, March 2003

March 2003

S2W (South) - CFG-10, March 2003
Available on request - please contact us.

S2W (North) - CFG-10, March 2003

March 2003

S2W (North) - CFG-10, March 2003
Available on request - please contact us.

S2W (South) - CFG-9, November 2002

November 2002

S2W (South) - CFG-9, November 2002
Available on request - please contact us.

S2W (North) - CFG-9, November 2002

November 2002

S2W (North) - CFG-9, November 2002
Available on request - please contact us.

S2W (South) - CFG-8, September 2002

September 2002

S2W (South) - CFG-8, September 2002
Available on request - please contact us.

S2W (North) - CFG-8, September 2002

September 2002

S2W (North) - CFG-8, September 2002
Available on request - please contact us.

S2W (South) - CFG-7, August 2002

August 2002

S2W (South) - CFG-7, August 2002
Available on request - please contact us.

S2W (North) - CFG-7, August 2002

August 2002

S2W (North) - CFG-7, August 2002
Available on request - please contact us.

S2W (North) - CFG-7 SPECIAL, July 2002

July 2002

S2W (North) - CFG-7 SPECIAL, July 2002
Available on request - please contact us.

S2W (South) - CFG-6, July 2002

July 2002

S2W (South) - CFG-6, July 2002
Available on request - please contact us.

S2W (North) - CFG-6, July 2002

July 2002

S2W (North) - CFG-6, July 2002
Available on request - please contact us.

S2W (South) - CFG-5, May 2002

May 2002

S2W (South) - CFG-5, May 2002
Available on request - please contact us.

S2W (North) - CFG-5, May 2002

May 2002

S2W (North) - CFG-5, May 2002
Available on request - please contact us.

S2W (South) - CFG-4, March 2002

March 2002

S2W (South) - CFG-4, March 2002
Available on request - please contact us.

S2W (North) - CFG-4, March 2002

March 2002

S2W (North) - CFG-4, March 2002
Available on request - please contact us.

S2W (South) - CFG-3, February 2002

February 2002

S2W (South) - CFG-3, February 2002
Available on request - please contact us.

S2W (North) - CFG-3, February 2002

February 2002

S2W (North) - CFG-3, February 2002
Available on request - please contact us.

S2W (North & South) - CFG-2, December 2001

December 2001

S2W (North & South) - CFG-2, December 2001
Available on request - please contact us.

S2W (North & South) - CFG-1, December 2001

December 2001

S2W (North & South) - CFG-1, December 2001
Available on request - please contact us.

Cycleway focus group meeting notes

May 2012

Meeting notes taken at the third cycleway focus group held at the project site office on 15 May 2012.

Cycleway focus group presentation

May 2012

The third presentation to the cycleway focus group held at the project site office on 15 May 2012.

Meeting notes, cycleway focus group

February 2011

Meeting notes taken at the second cycleway focus group meeting held at the project site office

Cycleway focus group presentation

February 2011

The second presentation to the cycleway focus group held at the project site office

Cycleway focus group presentation

December 2010

The first presentation to the cycleway focus group held at the project site office

Meeting notes, cycleway focus group

December 2010

Meeting notes taken at the first cycleway focus group meeting held at the project site office

Operation Noise Management Report

February 2014

Operation Noise Management Report, Part 1 Noise modelling and Calibration

Operation Noise Management Report

February 2014

Operation Noise Management Report, Part 2 Properties identified for treatment

Operation Noise Management Report

February 2014

Operation Noise Management Report, Part 3 Additional properties identified for treatment

Operation Noise Management Report

February 2014

Operation Noise Management Report, Part 4 Property treatment

Operation Noise Management Report

February 2014

Operation Noise Management Report, Architectural facade treatments

Operation Noise Management Report

December 2011

Operation Noise Management Report - December 2011
Available on request - please contact us.

Community information session presentation

May 2011

Presentation on noise from the community information session held on 28 May 2011 at Woolgoolga and Emerald Beach.
Available on request - please contact us.

Archaeological survey and report

March 2012

Archaeological survey and report for corduroy road at Woolgoolga Creek Road.
Available on request - please contact us.

Construction Compliance Tracking Report

August 2012

Six monthly construction compliance tracking report 11 February to 10 August 2012.

Construction Compliance Tracking Report

August 2012

Six monthly construction compliance tracking report 11 February to 10 August 2012.

Construction compliance tracking report

March 2012

Six monthly construction compliance tracking report 11 August 2011 to 10 February 2012.

Construction compliance tracking report

September 2011

Six monthly construction compliance tracking report 11 February 2011 to 12 August 2011.

Construction compliance tracking report

March 2011

Six monthly construction compliance tracking report 11 August 2010 to 10 February 2011.

Environmental representative monthly reports

March 2011

Environmental representative monthly reports - September 2010 to January 2011.

Construction Environment Management Plan (CEMP)

March 2010

Construction Environment Management Plan (CEMP)

Appendix B1 to the CEMP - Traffic Management and Safety Plan

March 2010

Appendix B1 to the CEMP - Traffic Management and Safety Plan

Appendix B2 to the CEMP - Construction Flora and Fauna Management Plan

March 2010

Appendix B2 to the CEMP - Construction Flora and Fauna Management Plan

Appendix B3 to the CEMP - Construction Heritage Management Plan

March 2010

Appendix B3 to the CEMP - Construction Heritage Management Plan

Appendix B4 to the CEMP - Construction Noise and Vibration Management

March 2010

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan - Main report.

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix A and B

March 2010

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix A and B.

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix C

March 2010

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix C, Part1.

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix C

March 2010

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix C, Part2.

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix C

March 2010

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix C, Part3.

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix D to H

March 2010

Appendix B4 to the CEMP - Construction Noise and Vibration Management Plan – Appendix D to H.

Appendix B5 to the CEMP - Construction Groundwater Management Plan

March 2010

Appendix B5 to the CEMP - Construction Groundwater Management Plan

Appendix B6 to the CEMP - Construction Air Quality Management Plan

March 2010

Appendix B6 to the CEMP - Construction Air Quality Management Plan

Appendix B7 to the CEMP - Construction Soil Erosion and Water Management Plan

March 2010

Appendix B7 to the CEMP - Construction Soil Erosion and Water Management Plan

Appendix B8 to the CEMP - Construction Contaminated Land Management Plan

March 2010

Appendix B8 to the CEMP - Construction Contaminated Land Management Plan

Appendix B9 to the CEMP - Construction Waste, Reuse, Recycling and Energy Management Plan

March 2010

Appendix B9 to the CEMP - Construction Waste, Reuse, Recycling and Energy Management Plan

Instrument of Modification Approval

October 2012

Approval to the Arrawarra rest area from the Department of Planning and Infrastructure.

Arrawarra Flooding Review

May 2012

Independent review of Flooding in the vicinity of Arrawarra Beach Road, Arrawarra.

Arrawarra Rest Area Bio-Retention Proposal

March 2012

A discussion paper to identify possible design improvements to surface water overflow quality.

Arrawarra Rest Area Submissions Report

December 2011

Arrawarra Rest Area Submissions Report, December 2011

Arrawarra Rest Area Environmental Assessment Report

April 2011

Arrawarra Rest Area Environmental Assessment Report

Arrawarra Rest Area Environmental Assessment Report Appendix

April 2011

Aboriginal cultural heritage assessment of project area, Arrawarra

Rest Area Assessment Submissions Report

May 2010

Rest Area Assessment Submissions Report

Sapphire to Woolgoolga Rest Area Assessment report parts A - D

September 2009

Rest Area Assessment Report: Parts A - D
Available on request - please contact us.

Sapphire to Woolgoolga Rest Area Appendicies parts A - D

September 2009

Sapphire to Woolgoolga Rest Area Appendicies parts A - D
Available on request - please contact us.

Consolidated Approval 2013

June 2013

Consolidated Approval including Mods 1 to 7.

Consolidated Approval including Mods 1, 2, 3 and 4

January 2011

Consolidated Approval including Mods 1, 2, 3 and 4

Modification 1 of Minister's approval

February 2010

Modification 1 of Minister's approval

Modification 2 of Minister's approval

November 2009

Modification 2 of Minister's approval

Record of decision to proceed by the Chief Executive of the NSW Roads and Maritime Services

February 2009

Record of decision to proceed by the Chief Executive of the NSW Roads and Maritime Services (formerly Roads and Traffic Authority)

NSW Department of Planning Director-General's environmental assessment report

January 2009

NSW Department of Planning Director-General's environmental assessment report

Approval by the NSW Minister for Planning

January 2009

Approval by the NSW Minister for Planning

Roads and Maritime Services letterwithdrawing rest area from the Sapphire to Woolgoolga environmental assessment

October 2008

Roads and Maritime Services (formerly Roads and Traffic Authority) letter withdrawing rest area from the Sapphire to Woolgoolga environmental assessment

Submissions report

July 2008

Submissions report

Cover, table of contents and glossary and abbreviations

November 2007

Cover, table of contents and glossary and abbreviations

Executive summary

November 2007

Executive summary

Chapter 1– Introduction

November 2007

Chapter 1– Introduction

Chapter 2 – Need for the Proposal

November 2007

Chapter 2 – Need for the Proposal

Chapter 3 – Project objectives

November 2007

Chapter 3 – Project objectives

Chapter 4 – Process for assessment and decision making

November 2007

Chapter 4 – Process for assessment and decision making

Chapter 5 – Community consultation

November 2007

Chapter 5 – Community consultation

Chapter 6 – Route option development and assessment

November 2007

Chapter 6 – Route option development and assessment

Chapter 7 – The Proposal

November 2007

Chapter 7 – The Proposal

Chapter 8 – Construction of the Proposal

November 2007

Chapter 8 – Construction of the Proposal

Chapter 9 – Environmental risk assessment

November 2007

Chapter 9 – Environmental risk assessment

Chapter 10 – Traffic, transport and economics

November 2007

Chapter 10 – Traffic, transport and economics

Chapter 11 – Noise and vibration

ovember 2007

Chapter 11 – Noise and vibration

Chapter 12 – Aboriginal heritage

November 2007

Chapter 12 – Aboriginal heritage

Chapter 13 – Non-Aboriginal heritage

November 2007

Chapter 13 – Non-Aboriginal heritage

Chapter 14 – Planning and land use

November 2007

Chapter 14 – Planning and land use

Chapter 15 – Agriculture

November 2007

Chapter 15 – Agriculture

Chapter 16 – Socio-economic analysis

November 2007

Chapter 17 – Flora and fauna

November 2007

Chapter 17 – Flora and fauna

Chapter 18 – Hydrology, water and soil management

November 2007

Chapter 18 – Hydrology, water and soil management

Chapter 19 – Landscape, visual and urban design

November 2007

Chapter 19 – Landscape, visual and urban design

Chapter 20 – Management of other environmental issues

November 2007

Chapter 20 – Management of other environmental issues

Chapter 21 – Cumulative impacts

November 2007

Chapter 21 – Cumulative impacts

Chapter 22 – Justification and conclusion

November 2007

Chapter 22 – Justification and conclusion

Appendices A to E

November 2007

Draft Statement of Commitments, Environmental Assessment requirements checklist, Roads and Maritime Services (formerly Roads and Traffic Authority) Land Acquisition Policy, Study team

Working paper 1 – Traffic and transport

November 2007

Working paper 1 – Traffic and transport

Working paper 2 – Noise and vibration

November 2007

Working paper 2 – Noise and vibration

Working paper 3 – Aboriginal heritage assessment

November 2007

Working paper 3 – Aboriginal heritage assessment

Working paper 4 – Land use, planning and socio-economic assessment

November 2007

Working paper 4 – Land use, planning and socio-economic assessment

Working paper 5 – Agricultural assessment

November 2007

Working paper 5 – Agricultural assessment

Working paper 6 – Sikh cultural assessment

November 2007

Working paper 6 – Sikh cultural assessment

Working paper 7 A & B

November 2007

Fauna investigations & Vegetation survey, Arrawarra interchange flora and fauna assessment, Targeted frog survey

Working paper 8 – Air quality monitoring

November 2007

Working paper 8 – Air quality monitoring

Appendix G – Significance assessments – flora and fauna

November 2007

Appendix G – Significance assessments – flora and fauna

Proposed Biodiversity Offset and Mitigation Strategy

May 2010

Proposed Biodiversity Offset and Mitigation Strategy

Economic analysis update

November 2007

Economic analysis update
Available on request - please contact us.

Director-General's requirements for environmental assessment

December 2006

Director-General's requirements for environmental assessment
Available on request - please contact us.

Part 3A Project Application Report Table of Contents and Section 1

October 2006

Part 3A Project Application Report Table of Contents and Section 1

Part 3A Project Application Report Section 2

October 2006

Part 3A Project Application Report Section 2

Part 3A Project Application Report Section 3

October 2006

Part 3A Project Application Report Section 3

Part 3A Project Application Report Section 4

October 2006

Part 3A Project Application Report Section 4

Part 3A Project Application Report Section 5

October 2006

Part 3A Project Application Report Section 5

Part 3A Project Application Report Section 6

October 2006

Part 3A Project Application Report Section 6

Part 3A Project Application Report Appendix A-C

October 2006

Part 3A Project Application Report Appendix A-C

Coffs Harbour Highway Planning Strategy Preferred Option Report Sections 1-7 & Appedicies A-C

November 2004

Coffs Harbour Highway Planning Strategy Preferred Option Report Sections 1-7 & Appedicies A-C.
Available on request - please contact us.

Supplementary Options Report Sections 1 - 7 & Appendices A - E

February 2004

Supplementary Options Report Sections 1 - 7 & Appendices A - E
Available on request - please contact us.

Sapphire to Woolgoolga referral decision

January 2008

Sapphire to Woolgoolga referral decision

Sapphire to Woolgoolga referral form

November 2007

Sapphire to Woolgoolga referral form

Draft Route Options Development Report Sections 1 - 11 plus Appendix A

December 2002

Draft Route Options Development Report Sections 1 - 11 plus Appendix A
Available on request - please contact us.

Working paper No 1: Statutory and strategic planning issues, November 2002

November 2002

Working paper No 1: Statutory and strategic planning issues, November 2002
Available on request - please contact us.

Working paper No 2: Non-Indigenous heritage assessment, November 2002

November 2002

Working paper No 2: Non-Indigenous heritage assessment, November 2002
Available on request - please contact us.

Working paper No 3: Geotechnical investigation, November 2002

November 2002

Working paper No 3: Geotechnical investigation, November 2002
Available on request - please contact us.

Working paper No 4: Noise and vibration assessment, November 2002

November 2002

Working paper No 4: Noise and vibration assessment, November 2002
Available on request - please contact us.

Working paper No 5: Ecological assessment, November 2002

November 2002

Working paper No 5: Ecological assessment, November 2002
Available on request - please contact us.

Working paper No 6: Agricultural land use assessment, November 2002

November 2002

Working paper No 6: Agricultural land use assessment, November 2002
Available on request - please contact us.

Working paper No 7: Socio-economic assessment, November 2002

November 2002

Working paper No 7: Socio-economic assessment, November 2002
Available on request - please contact us.

Working paper No 8: Traffic and transport assessment, November 2002

November 2002

Working paper No 8: Traffic and transport assessment, November 2002
Available on request - please contact us.

Working paper No 9: Cost estimates and economic analysis, November 2002

November 2002

Working paper No 9: Cost estimates and economic analysis, November 2002
Available on request - please contact us.

Working paper No 10: Urban design and visual assessment, November 2002

November 2002

Working paper No 10: Urban design and visual assessment, November 2002
Available on request - please contact us.

Share this page: