The upgrade of the Pacific Highway at Bulahdelah involved the construction of about 8.6 kilometres of four lane divided road with an eastern bypass of the Bulahdelah township.

Updates and announcements

Operational noise report now available

As part of the conditions of approval for the project, an operational noise report has been prepared by Wilkinson Murray, acoustics and air quality consultants. Operational noise is determined by computer modelling after calibration from direct noise measurements taken once the project is complete.

The results of the Operational Noise Assessment contained in the report show that highway noise levels for the Bulahdelah upgrade are in accordance with the requirements of the ENMM and that the noise mitigation measures (in the form of noise walls and low noise pavements) applied to the project are considered adequate and no further treatments are required to your property.

The Operational Noise Report (PDF, 12MB) is now available to view or download.

Project background

The Bulahdelah upgrade project was approved by the NSW Minister for Planning on 9 July 2007.

The upgrade project is jointly funded by the Australian and NSW governments.

The upgrade of the Pacific Highway at Bulahdelah involved the construction of about 8.6 kilometres of four lane divided road with an eastern bypass of the Bulahdelah township.

Post construction operational noise report

May 2014

Provides the outcomes of noise monitoring after construction of the Buldahdelah bypass is complete.

Overview

October 2004

Glossary

October 2004

Chapter 1 What is Proposed and Why?

October 2004

Figure 1.4 Photo-illustration of Southern Section (Looking South)

October 2004

Figure 1.5 Photo-illustration of the Central and Northern Sections (Looking South)

October 2004

Chapter 2 The Process for Considering the Proposal

October 2004

Chapter 3 Environmental Context

October 2004

Figure 3.2 Regional Vegetation

October 2004

Figure 3.7 Urban and Landscape Design Context

October 2004

Chapter 4 Consideration of Alternatives

October 2004

Figure 4.7 Key Constraints and Alignment Alternatives between Bombah Point Road and Lee Street

October 2004

Chapter 5 The Proposal

October 2004

Figure 5.2a Horizontal Alignment

October 2004

Figure 5.2b Horizontal Alignment

October 2004

Figure 5.2c Horizontal Alignment

October 2004

Figure 5.2d Horizontal Alignment

October 2004

Figure 5.2e Horizontal Alignment

October 2004

Figure 5.2f Horizontal Alignment

October 2004

Figure 5.2g Horizontal Alignment

October 2004

Figure 5.4 Photo-illustration of Southern Section (Looking South)

October 2004

Figure 5.6 Photo-illustration of the Central and Northern Sections (Looking South)

October 2004

Figure 5.12a Landscape Concept Plan

October 2004

Figure 5.12b Landscape Concept Plan

October 2004

Figure 5.18a Approximate Extent of Construction

October 2004

Figure 5.18b Approximate Extent of Construction

October 2004

Figure 5.22a Potential Construction Work Sites (Temporary)

October 2004

Figure 5.22b Potential Construction Work Sites (Temporary)

October 2004

Figure 5.23a Location of Basins and Culverts

October 2004

Figure 5.23b Location of Basins and Culverts

October 2004

Chapter 6 Regional Impacts

October 2004

Chapter 7 Local Impacts

October 2004

Figure 7.6a Existing Road and Tracks Affected by the Proposal

October 2004

Figure 7.6b Existing Road and Tracks Affected by the Proposal

October 2004

Figure 7.7 Changes to Mountain Access

October 2004

Figure 7.11 Inferred Boundary of Colluvium

October 2004

Figure 7.16a Location of Historical Heritage Recordings

October 2004

Figure 7.16b Location of Historical Heritage Recordings

October 2004

Figure 7.17 Proposed Upgrade Relative to Known Features of Alunite Mine

October 2004

Figure 7.19a Properties Affected by Acquisition

October 2004

Figure 7.19b Properties Affected by Acquisition

October 2004

Figure 7.22 Photo-Illustration of Southern Section Looking Southwards from Bulahdelah (Alum) Mountain Lookout

October 2004

Figure 7.25a Construction Noise Experienced by Typical Noise Sensitive Receivers within 200 metres of the Proposal

October 2004

Figure 7.25b Construction Noise Experienced by Typical Noise Sensitive Receivers within 200 metres of the Proposal

October 2004

Figure 7.26a 2018 Night-time Noise Level Contours

October 2004

Figure 7.26b 2018 Night-time Noise Level Contours

October 2004

Figure 7.27a 2018 Daytime Noise Level Contours

October 2004

Figure 7.27b 2018 Daytime Noise Level Contours

October 2004

Chapter 8 Justification of the Proposal

October 2004

Bibliography

October 2004

Appendix A Summary of Issues Raised During Community and Stakeholder Consultation

October 2004

Appendix B Requirements of the Director-General of the Department of Infrastructure Planning and Natural Resources

October 2004

Appendix C Checklist of Key Issues to be Addressed in the EIS

October 2004

Appendix D Declaration

October 2004

Appendix E Study Team

October 2004

Appendix F Summary of Environmental Management Measures

October 2004

Appendix G RTA Land Acquisitions Policy

October 2004

Technical Paper 1 - Community and Stakeholder Involvement

November 2004

Technical Paper 2 - Statutory Planning

November 2004

Technical Paper 3 - Need and Route Evaluation

November 2004

Technical Paper 4 - The Proposal

November 2004

Technical Paper 5 - Environmental Management Framework

November 2004

Technical Paper 6 - Traffic and Transport

November 2004

Technical Paper 7 - Ecological Assessment and Species Impact Statement

November 2004

Appendix A NSW National Parks and Wildlife Service Director-General's SIS Requirements (checklist)

November 2004

Appendix B Curricula Vitarum of Principal Authors

November 2004

Appendix C Weather Conditions

November 2004

Appendix D Detailed Survey Methods

November 2004

Appendix E Aquatic Ecological Assessment

November 2004

Appendix F Vegetation Community Descriptions

November 2004

Appendix G SEPP 44 Koala Habitat Assessment

November 2004

Appendix H Flora Species List

November 2004

Appendix I Fauna Species List

November 2004

Appendix J Eight Part Test and Habitat Maps

November 2004

Appendix K Confidential Orchid Information (Not published)

November 2004

Technical Paper 8 - Water

November 2004

Technical Paper 9 - Hazard and Risk

November 2004

Technical Paper 10 - Energy, Waste and Demand on Resources

November 2004

Technical Paper 11 - Topography, Geology and Soils

November 2004

Technical Paper 12 - Visual

November 2004

Technical Paper 13 - Social and Economic

November 2004

Technical Paper 14 - Noise and Vibration

November 2004

Technical Paper 15 - Air

November 2004

Technical Paper 16 - Heritage

November 2004

Share this page: