Gerringong to Bomaderry - Princes Highway upgrade: document library

Preferred option development

 

Oral History

December 2009

Transcripts from the oral history recordings for the Gerringong to Bomaderry Princes Highway upgrade.

Toolijooa Ridge Preferred Option Report – Addendum One to the Preferred Option Report

June 2009

The route optimisation process identified two route options crossing the Toolijooa Ridge by different means. The purpose of this report is to identify those aspects of each route that are likely to have the greatest influence on both cost and other than cost criteria in recommending the preferred route in the vicinity of Toolijooa Ridge.

Gerringong and Berry Preferred Access Arrangements Report

June 2009

This report is a summary of design developments for the access arrangements for Gerringong and Berry.

Access Options Submissions Summary Report

June 2009

This report provides an overview of the consultation program and a summary and review of the 972 submissions received in response to the display of the access options.

Sustainability factors, climate change and economic appraisal

March 2009

This report presents the findings of further work conducted following an ecologically sustainable development workshop in December 2007, to access the impacts of climate change, peak oil theory, greenhouse gas emissions and greenfield land consumption on the short-listed options.

Access Value Management Workshop Report

February 2009

Value management report for the access options at Gerringong and Berry.

Preferred Option Report

October 2008

This document has been developed to explain the preferred option development process. It describes the investigative work and analysis that has led to the identification of the preferred option. It describes the preferred option and summarises the next steps.

Community update

December 2010

The December 2010 community update outlines the proposed design improvements to the Berry access arrangements following discussions with Shoalhaven City Council and the community.

Community update

November 2009

Community update with arrangements for local road and property access

Community update

June 2009

Community upgrade announcing the preferred option around the Toolijooa Ridge and the access arrangements for Gerringong and Berry have been finalised.

Letter to the householder

March 2009

Householder letter - project update

Community update

October 2008

Community upgrade announcing the preferred option for the project has been finalised.

Ground conditions

October 2008

Map showing acid sulfate soils and ground conditions identified during the preferred option process.

Land use

October 2008

Map showing land-use categorisation identified during the preferred option process.

Daily traffic

October 2008

Map showing predicted daily traffic patterns identified during the preferred options process.

Heritage in Gerringong

October 2008

Map showing areas of heritage significance For Gerringong identified during the preferred option process.

Flooding and drainage in Gerringong

October 2008

Map showing the 1 in 100 year flood limit for Gerringong township as identified during the preferred option process.

Mobility and community amenity in Gerringong

October 2008

Map showing mobility and community amenity in Gerringong as identified during the preferred option process.

Heritage in Berry

October 2008

Map showing areas of heritage significance for Berry identified during the preferred option process.

Heritage in Berry - Pulman Street

October 2008

Map showing areas of heritage significance in the Pulman Street precinct identified during the preferred option process.

Flooding and drainage in Berry

October 2008

Map showing the 1 in 100 year flood limit for Berry township as identified during the preferred option process.

Mobility and Community Amenity in Berry

October 2008

Map showing mobility and community amenity in Berry as identified during the preferred option process.

Traffic - existing turning movements in Berry

October 2008

Map showing existing traffic movement sin Berry township as identified during the preferred option process.

Route options development

 

Route Options Submissions Report

September 2008

This report provides an overview of the issues raised from 996 submissions received in response to the project’s route options development report and public display of seven feasible options.

Fog monitoring

September 2008

Key findings from fog monitoring which occurred for a period of 12 months as part of the route options development process from October 2007 to October 2008.

Value Management Report

May 2008

Value management workshop report

Table of contents and Executive summary

November 2007

Route options development report: detailing the route options development and selection process and a description of the short listed routes for community and stakeholder comment and consideration.

Chapter 1 - Introduction

November 2007

Chapter 2 - Strategic context

November 2007

Chapter 3 - Community and stakeholder involvement

November 2007

Chapter 4 - Statutory and strategic planning

November 2007

Chapter 5 - The existing environment

November 2007

Chapter 6 - Design considerations

November 2007

Chapter 7 - Development of route options

November 2007

Chapter 8 - Description of short listed route options

November 2007

Chapter 9 - Project cost, economic analysis and safety

November 2007

Chapter 10 - Summary of next steps

November 2007

Appendix A - Route Options Workshop Findings

November 2007

Appendix B - Preliminary Geotechnical Report (Part A)

November 2007

Appendix B - Engineering Logs and Core Photographs For Geotechnical Boreholes Part A

November 2007

Appendix B - Engineering Logs and Core Photographs For Geotechnical Boreholes Part B

November 2007

Appendix B - Engineering Logs and Core Photographs For Geotechnical Boreholes Part C

November 2007

Appendix B - Engineering Logs for Test Pits

November 2007

Appendix B - Electric Piezocone Plots and Pore Pressure Dissipation Tests Part A

November 2007

Appendix B - Electric Piezocone Plots and Pore Pressure Dissipation Tests Part B

November 2007

Appendix B - Geological Mapping Results

November 2007

Appendix B - Geotechnical Laboratory Test Results Part A

November 2007

Appendix B - Geotechnical Laboratory Test Results Part B

November 2007

Appendix B - Point Load Test Results

November 2007

Appendix B - Previous Relevant Borehole Logs Part A

November 2007

Appendix B - Previous Relevant Borehole Logs Part B

November 2007

Appendix B - Preliminary Geotechnical Report (Part B)

November 2007

Appendix B - Preliminary Geotechnical Report (Part C)

November 2007

Appendix C - Preliminary Urban and Regional Design Strategy Part A

November 2007

Appendix C - Preliminary Urban and Regional Design Strategy Part B

November 2007

Appendix D - Preliminary Traffic Assessment Report

November 2007

Appendix E - Preliminary Public Utilities and Services Report

November 2007

Appendix F - Preliminary Social Economic Impacts Report

November 2007

Appendix G - Preliminary Biological Report (Terrestrial Flora and Fauna) Part A

November 2007

Appendix G - Preliminary Biological Report (Terrestrial Flora and Fauna) Part B

November 2007

Appendix G - Preliminary Biological Report (Terrestrial Flora and Fauna) Part B

November 2007

Appendix H - Preliminary Biological Report (Aquatic Ecology and Water Quality Management)

November 2007

Appendix I - Preliminary Indigenous and Non-Indigenous Heritage Assessment Part A

November 2007

Appendix I - Preliminary Indigenous and Non-Indigenous Heritage Assessment Part B

November 2007

Appendix I - Preliminary Indigenous and Non-Indigenous Heritage Assessment Part C

November 2007

Appendix J - Preliminary Air Quality Management Report

November 2007

Appendix K - Preliminary Flooding and Drainage Report Part A

November 2007

Appendix K - Preliminary Flooding and Drainage Report Part B

November 2007

Appendix L - Preliminary Planning and Zoning Issues Report

November 2007

Appendix M - Preliminary Land Use Issues Report Part A

November 2007

Appendix M - Preliminary Land Use Issues Report Part B

November 2007

Appendix M - Preliminary Land Use Issues Report Part C

November 2007

Appendix M - Preliminary Land Use Issues Report Part D

November 2007

Appendix M - Preliminary Land Use Issues Report Part E

November 2007

Appendix M - Preliminary Land Use Issues Report Part F

November 2007

Appendix N - Preliminary Traffic Noise and Vibration Assessment Report

November 2007

Appendix O - Preliminary Property Impacts Report

November 2007

Appendix P - Preliminary Climatic Assessment Report

November 2007

Appendix Q - Preliminary Cumulative Effects Report

November 2007

Appendix R - Road Safety Audit - Stage 1, Route Options - Preliminary Concept Design

November 2007

Peer Review 2008

May 2008

Route optimisation peer review - Connell Wagner report 2008.

Letters to the householder

June 2008

Route options development process decision making.

Community update

November 2007

Community update detailing route options and the route options display activities.

Community update

July 2007

Community update highlighting project objectives, constraints and issues, and outlining environmental studies and community consultation planned for the project.

Community update

April 2007

Community update providing a summary of the February 2007 community information sessions and the status of field investigations being undertaken for the route options development process.

Community update

January 2007

Community update announcing February 2007 community information sessions and upcoming filed investigations being carried out for the route options development process.

Long list of route options

November 2007

Map of all route options.

Cultural heritage

November 2007

Map showing areas of heritage significance identified during the route options development process.

Traffic patterns

November 2007

Map showing existing peak hour traffic patterns identified during the route options development process.

Flooding and drainage

November 2007

Map showing 1 in 100 year flood limits identified during the route options development process.

Flora and fauna

November 2007

Map showing threatened flora and fauna species identified during the route options development process.

Ground conditions

November 2007

Map showing acid sulfate soils and ground conditions identified during the route options development process.

Land use

November 2007

Map showing land-use categorisation identified during the route options development process.

Public utilities

November 2007

Map showing major public utilities identified during the route options development process.

Planning and zoning

November 2007

Map showing planning and zoning land classifications identified during the route options development process.

Meeting notes

April 2007

Interest group information 2007

Presentation

February 2007

Interest group information session presentation

Meeting notes

February 2007

Community information session meeting notes

Presentation

February 2007

Information session – introduction to the project team and project progress

Pre-2007 and previous studies

 

Meeting report

October 2006

Summary of key issues raised at the Gerringong to Bomaderry Princes highway upgrade planning focus meeting 29 September 2006.

Community update

September 2006

Community update providing summary of key issues raised during community workshops and information sessions in May 2006.

Community update

March 2006

Community update to announce the Gerringong to Bomaderry Princes highway upgrade project.

Community consultation report

June 2006

Community consultation report.

Workshop meeting notes

May 2006

Workshop meeting notes

Presentation

May 2006

Community involvement in the development of route options for the upgrade of the Princes Highway between Gerringong and Bomaderry.

Princes Highway Berry Bypass Project Value Management Study Report

March 1996

Report on the value management workshop held on 13 and 14 March 1996. This study was part of a process that was terminated in 1998 by the then NSW Government. The current project is part of a new process that had a fresh look at the bypass issue.

Quantm study

September 2006

What is the Quantm study?

1996 Berry bypass study

September 2006

Review of the 1996 Berry bypass study.

1991 Gerringong to Berry route study

September 2006

Review of the route evaluation study undertaken in 1991 for the Princes Highway from Gerringong to Berry.