Project documents

Project and community updates

Urban and landscape design community feedback report

February 2015

Feedback received about the urban and landscape design has been collated into a Community Feedback Report.

Presentation

October 2014

Presentation from the urban design and landscaping workshop held 28 October 2014

Feedback form

October 2014

A copy of the feedback form from the workshop held on 28 October 2014.

Project Flow Chart

July 2014

This Flowchart highlights key project phases.

Bridge at Berry

July 2014

This poster shows the bridge at Berry and highlights changes from the Approved Concept Design.

Broughton Creek Bridges 1,2 and 3

July 2014

This poster shows Broughton Creek bridges 1, 2 and 3 and highlights changes from the Approved Concept Design.

Kangaroo Valley Road Overbridge

July 2014

This poster shows the Kangaroo Valley Road overbridge and highlights changes from the Approved Concept Design.

Tindalls Lane Overbridge

July 2014

This poster shows the Tindalls Lane overbridge.

Austral Park Road Interchange

July 2014

This poster shows the Austral Park Road Interchange and highlights changes from the Approved Concept Design.

Berry North Interchange

July 2014

This poster shows the Berry North Interchange and highlights changes from the Approved Concept Design.

Berry South/ Kangaroo Valley Road interchange

July 2014

This poster shows the Berry South/Kangaroo Valley Road Interchange and highlights changes from the Approved Concept Design.

Tindalls Lane Interchange

July 2014

Toolijooa Road Interchange

July 2014

This poster shows the Tindalls Lane Interchange and highlights changes from the Approved Concept Design.

Pedestrian and Cycle Paths

July 2014

This poster shows pedestrian and cycle path arrangements in proximity to the Berry Township.

Berry North Entranceway

July 2014

This poster shows the planned location of the David and Alexander Berry Memorial, north of Berry.

Berry South Entranceway

July 2014

This poster shows the proposed key features of the Kangaroo Valley Road overbridge, designed to be the Berry South entranceway.

Proposed Finishes

July 2014

This poster shows the key finishes proposed for major elements of the bypass.

Huntingdale Park Road noise mound/wall

July 2014

This poster shows the Huntingdale Park Road noise mound/wall and highlights changes from the Approved Concept Design.

North Street Noise Mound

July 2014

This poster shows the North Street noise mound and highlights changes from the Approved Concept Design.

Fauna Crossings

July 2014

Fauna Crossings

July 2014

This poster provides information on proposed fauna crossings.

Vegetation Management

July 2014

This poster provides information on vegetation management strategies.

Letter to residents

December 2014

Weekend work on Princes Highway between Toolijooa Road and Tindalls Lane, 13 and 14 December 2014.

September 2014

Continuation of early work

Letter to the householder about continuation of early work starting in mid September 2014

Letters to the householder

May 2014

Letter to the householder advising of early investigative work.

Community Consultation Strategy

Community Consultation Strategy

July 2015

Toolijooa Road Fill Work Construction Environment Plan

Approval Letter from the Department of Planning and Infrastructure

February 2014

Approval letter from the Department of Planning and Infrastructure.

Staging Report

February 2014

Toolijooa Road Fill Works stage of Foxground and Berry bypass project: Staging Report, 11 November 2013 (Revision 3).

Construction Environment Management Plan (CEMP)

February 2014

Construction Environmental Management Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass Project, January 2014 (Revision 1).

Appendix B1 Construction traffic management sub plan

February 2014

Appendix B1 Construction Traffic Management Sub Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (Revision 4).

Appendix B2 Construction flora and fauna management sub plan

February 2014

Appendix B2 Flora and Fauna Management Sub Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (revision 4).

Appendix B3 Construction noise and vibration management sub plan

February 2014

Appendix B3 Noise and Vibration Management Sub Plan Toolijooa Road Fill Works Stage of Foxground and berry Bypass, January 2014 (Revision 4).

Appendix B4 Construction soil and water quality management sub plan

February 2014

Appendix B4 Soil and Water Quality management Sub Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (revision 4).

Appendix B5 Construction heritage management sub plan

February 2014

Appendix B5 Construction Heritage Management Sub Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (Revision 4).

Compliance Tracking Program

February 2014

Compliance tracking program Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (Revision 4).

Community Communications Strategy

February 2014

Community Communications Strategy Foxground and berry Bypass Stage one: Toolijooa Road Fill Works, January 2014 (revision 2).

Landscape and Revegetation Management Sub Plan

February 2014

Toolijooa Road fill Works Stage of Foxground and Berry Bypass Project landscape and Revegetation management Sub Plan, January 2014 (Report 4).

Completion Report Stage 1

October 2014

Conditions of Approval project documents

Construction and Environment Management Plan

Appendix A1 Legal and other requirements

Appendix A3 Environmental aspects, impacts and risk assessment

Appendix A5 Ancillary Facilities Assessment

Appendix A7 Environmental Incident Classification and Reporting Procedure

Appendix A8 Environmental inspection checklist

Appendix B1 Construction Traffic Management Sub-plan

Appendix B2 Construction Flora and Fauna Management Sub-plan

Appendix B3 Construction Noise and Vibration Management Sub-plan

Appendix B4 Construction Soil and Water Quality Management Sub-plan

Appendix B5 Construction Heritage Management Sub-plan

Appendix B6 Construction Air Quality Management Sub-plan

Appendix B7 Construction Waste and Energy Management Sub-plan

Fauna crossings report

November 2014

Glen Devon heritage interpretation plan

Glen Devon Cultural Heritage Assessment Documentary and Physical Investigation

Non-Aboriginal archival recording

November 2014

Non-Aboriginal archaeological investigations

Non-Aboriginal Archaeological Methodology

July 2014

Nest Box Management Plan

October 2014

Microbat Management Plan

April 2014

Urban Design and Landscape Plan

September 2014

Compliance Status Report

September 2014

Construction Compliance Status Report 1

October 2014 to April 2015

Construction Compliance Status Report 2

May 2015 to October 2015

Construction Compliance Status Report 3

November 2015 to April 2016

Operational Noise Management Report

March 2015

Environmental Assessment

Major Project Application

February 2014

Conditions of Approval

February 2014

Minister's Conditions of Approval outlining the requirements set by the Minister for Planning and Infrastructure for the project. These conditions will guide the project through detailed design and construction.

C4 Modification

July 2015

C13 Modification

January 2015

Approved Concept Design

July 2013

This Poster shows the approved concept design on a map.

Submissions Report

May 2013

The submissions report provides responses to issues raised in submissions received from the community, interest group and stakeholders. The report also details changes made to the proposed design since the environmental assessment display.

Refined Concept Design Map

May 2013

This poster shows the refined concept design on a map.

Victoria Street Access arrangements

May 2013

This poster shows the Victoria Street access arrangements on a map.

Victoria Street Access arrangements (printable verison)

May 2013

This printable poster shows the Victoria Street access arrangements on a map.

Main report

November 2012

Appendices - Table of Contents

November 2013

Appendices A-E

November 2013

A - Director-General's requirements
B - Minister's order under Part 3A of the EP&A Act
C - Community Consultation
D - Traffic and Transport
E - Noise and Vibration

Appendices F-I

November 2013

F - Terrestrial Flora and Fauna
G - Aquatic ecology and water quality management
H - Surface water, groundwater and flooding
I - Urban Design

Appendices J-O

November 2013

J - Aboriginal Cultural Heritage
K - Non-Aboriginal (historic) heritage
L - Property access impacts
M - Socio-economic
N - Air Quality
O - Greenhouse gas and Climate Change

Letter to Householder

July 2013

Foxground and Berry bypass project has been approved by the NSW Minister for Planning and Infrastructure and the Conditions of Approval for the project provided to Roads and Maritime.

Letter to householder

May 2013

Environmental assessment submissions report has been published. design refinements to address issues raised in submissions are outlined.

Community Update - November 2012

November 2012

This community update outlines the environmental assessment display including where the environmental assessment documentation can be viewed, community information sessions and how to make a submission.

Community Update - October 2012

October 2012

This community update shows the project benefits, concept design map, key features, environmental assessment and submissions process.

Features and benefits of the concept design

November 2012

This poster describes the concept design.

How to make a submission

November 2012

This poster describes how to make a submission during the display of the environmental assessment.

Flooding

November 2012

This poster describes existing and forecast flooding conditions.

Traffic and Transport

November 2012

This poster gives an overview of the traffic and transport assessment.

Aboriginal Cultural Heritage

November 2012

These two posters describe Aboriginal cultural heritage significant places and landscapes.

Non-aboriginal (historic) heritage

November 2012

These two posters describe non-Aboriginal (historic) heritage sites and a summary of identified heritage items and potential impacts.

Flora and Fauna

November 2012

This poster describes flora and fauna identified in the study area.

Victoria Street Options

November 2012

This poster gives an overview of the three options proposed for Victoria Street.

Regional Manager's update

February 2013

Regional Manager's update 6 February 2013.

Process Flowchart

July 2013

Foxground to Berry bypass environmental assessment flowchart.

Gazetted Declaration

September 2012

The Department of Planning declared this to be a project of regional significance to which Part3A of the Environmental Assessment and Planning Act, 1979 Applies.

Director-General's requirements

February 2011

The Director General of the NSW Department of Planning has provided a list of requirements to be addressed by the environmental assessment of this proposal.

Preliminary Environmental Assessment

December 2010

A preliminary environmental assessment for the proposal was submitted to the Department of Planning in December 2010.

Industry Briefing Presentation

November 2012

Roads and Maritime Services presented at an industry briefing in November 2012. Peter letts General Manager Project management addressed industry leaders about the Foxground and Berry bypass project.

Southern Bypass Review

External Review of RMS findings

June 2012

Updated 29 June 2012. Report prepared by the Independent Reviewer on the Berry Bypass route comparison.

Southern Bypass Review - Draft Terms of Reference

March 2012

This draft Terms of Reference provides the scope and intent for an independent examination of the Berry bypass southern route review process.

Addenda to Report on Route Feasibility Cost estimates

June 2012

Updated on 29 June, this is a list of addenda items included in the Report on Route Feasibility Cost estimates, June 2012.

Executive Summary

June 2012

Updated 29 June 2012. Report prepared by RMS Technical Investigation Group.

Report on Route Feasibility Comparative Cost Estimates

June 2012

Updated 29 June 2012. Report prepared by RMS Technical Investigation Group.

Appendix A1 - Investigation Overview

June 2012

These report Appendices include: The terms of reference for technical investigations group, qualifications of the members in the technical investigations group and independent reviewers and, the issues, actions and outcomes register from the technical investigations group.

Appendix B1 - Design

June 2012

These report appendices include the original design submission for the southern bypass route, the concept design criteria and addendum design criteria for the Princes Highway Gerringong to Bomaderry upgrade.

Appendix C1 - Flooding Investigations

June 2012

This report appendix includes the flood investigation graphics.

Appendix D1 - Geotechnical investigations Map 1 of 4

June 2012

This report appendix is 1 of 4 maps showing the locations geotechnical testing for the southern Berry bypass route.

Appendix D1 - Geotechnical Investigations Map 2 of 4

June 2012

This report appendix is 2 of 4 maps showing the locations of geotechnical testing for the southern Berry bypass route.

Appendix D1 - Geotechnical Investigations Map 3 of 4

June 2012

This report appendix is 3 of 4 maps showing the locations of geotechnical testing for the southern Berry bypass route.

Appendix D1 - Geotechnical Investigations Map 4 of 4

June 2012

This report appendix is 4 of 4 maps showing the locations of geotechnical testing for the southern Berry bypass Route.

Appendix D2 - Geotechnical Investigations Report - Part 1

June 2012

This report appendix is the RMS Factual Geotechnical Report for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigations Report - Part 2

June 2012

This report appendix shows the results from the borehole geotechnical testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigations Report - Part 3

June 2012

This report appendix shows the results taken from borehole geotechnical testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigation Report - Part 4

June 2012

This report appendix shows the results from borehole geotechnical testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigation Report - Part 5

June 2012

This report appendix shows the results from borehole geotechnical testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigation Report - Part 6

June 2012

This report appendix shows the results from cone penetration testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigation Report - Part 7

June 2012

This report appendix shows the results from pore pressure dissipation and geotechnical laboratory testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigation Report - Part 8

June 2012

This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigations Report - Part 9

June 2012

This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigations Report - Part 10

June 2012

This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigations Report - Part 11

June 2012

This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.

Appendix D2 - Geotechnical Investigations Report - Part 12

June 2012

This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.

Appendix D3 - Geotechnical Investigations

June 2012

This report appendix is a report outlining the soil compressibility and acid sulphate soil issues for the southern Berry bypass route.

Appendix E1 - Utility interfaces investigation

June 2012

This report appendix is a memorandum from Railcorp regarding possible crossing of the rail corridor for the southern Berry bypass route.

Appendix F1 and F2 - Construction Methodology

June 2012

These report appendices include the construction method statements for major structures and bulk earthworks.

Appendix G1 and G2 - Design and Construction program

June 2012

These report appendices include the detailed design and construction programs for the northern and southern Berry bypass routes.

Appendix H1 - Cost Estimate

June 2012

Updated 29 June 2012. This report appendix includes the cost breakdown of infrastructure items for the northern and southern Berry bypass routes.

Addenda to Route Feasibility Cost Estimation Report

June 2012

Updated 29 June 2012. Addenda to the report on Route Feasibility Cost Estimates, June 2012.

Spreadsheet printouts and summaries - Northern Route

June 2012

Updated on 29 June. Spreadsheet printouts and summaries - northern route.

Spreadsheet printouts and summaries - Southern Route

June 2012

Updated on 29 June. Spreadsheet printouts and summaries - Southern Route.

Project Management Office - Concurrence Report

June 2012

Updated 29 June 2012. Project Management Office - Concurrence Report.

Summary of the issues, Actions and Outcomes Register

June 2012

In order to assist the community with understanding the Issues, Actions and Outcomes Register, we have created an abbreviated version that summarises some of the major issues.

Issues, Actions and Outcomes Register

May 2012

Previously called the Critical issues Register, this document t racks all of the critical technical questions being raised by the community with the actions and outcomes - updated on 29 May 2012.

Regional Manager's Message - 17 July 2012

July 2012

Regional Manager's message - 17 July 2012.

Regional Manager's Message - 10 July 2012

July 2012

Regional Manager's Message - 10 July 2012

19 June 2012

June 2012

Regional Manager's weekly update

12 June 2012

June 2012

Regional Manager's weekly update

5 June 2012

June 2012

Regional Manager's weekly update

29 May 2012

May 2012

Regional Manager's weekly update

22 May 2012

May 2012

Regional Manager's weekly update

15 May 2012

May 2012

Regional Manager's weekly update

8 May 2012

May 2012

Regional Manager's weekly update

1 May 2012

May 2012

Regional Manager's weekly update

24 April 2012

April 2012

Regional Manager's message to the community

17 April 2012

April 2012

Regional Manager's message to the community

February 2012

February 2012

Regional Manager's message to the community

Media Release - June 2012

June 2012

Announcement by the Minister concerning the decision on Berry bypass review.

Media Release - February 2012

February 2012

Announcement by the Member for Kiama concerning the Southern Berry review.

How the cost estimates have been made

June 2012

Fact sheet explaining how the cost estimates have been made.

Overview of the Southern bypass route Report and Decision Process

May 2012

Overview of the Southern Bypass Route Report and Decision Process - 28 May 2012.

Independent Reviewers Update #2

May 2012

Independent Reviewers update - berry bypass review 23 May 2012

Kangaroo valley Road Interchange

May 2012

kangaroo Valley Road interchange - Berry bypass - 21 May 2012.

Design development and costing

May 2012

Design development and costing factsheet

independent Reviewer's update #1

May 2012

Independent Reviewers Update - Berry bypass review 8 May 2012.

Independance of the process

April 2012

Berry bypass review - independence of the process factsheet.

Geotech fact sheet

March 2012

Factsheet explaining geotechnical facts.

Costing Fact sheet

February 2012

Factsheet explaining costing facts.

Letter to the householder

June 2012

NSW Government announces northern alignment for environmental assessment.

Letter to the householder

June 2012

Letter mailed out to the community explaining what information the Route Feasibility Comparative Cost Estimate Report will contain.

preferred Berry Bypass Alignment

June 2012

Preferred Berry Bypass Alignment.

Kangaroo Valley Road Interchange

June 2012

Preferred Berry Bypass alignment - Kangaroo Valley Road Interchange.

Revised location

April 2012

Revised southern Berry bypass review location.

Revised location

March 2012

Revised southern Berry bypass review location.

Preliminary Location

January 2012

Preliminary suggested southern Berry bypass location.

3 July 2012

July 2012

Community Q&A Session southern Berry bypass review meeting notes - 3 July 2012

3 July 2012

July 2012

Meeting Notes from discussion on the issues analysis for questions and comments about the investigations into the southern route made by the southern route proponents.

3 July 2012

July 2012

Updated 17 July 2012. Issues analysis for questions and comments about the investigations into the southern route made by the southern route proponents.

3 July 2012

July 2012

Adjustment sums cost estimate breakdown. Additional information provided at meeting with southern route proponents on 3 July 2012.

3 July 2012

July 2012

Berry Bridge cost estimate breakdown. Additional information provided at meeting with southern route proponents on 3 July 2012.

3 July 2012

July 2012

Imported fill cost estimate breakdown. Additional information provided at meeting with southern route proponents on 3 July 2012.

3 July 2012

July 2012

Local roads cost estimate breakdown. Additional information provided at meeting with southern route proponents on 3 July 2012.

3 July 2012

July 2012

Adjustment sums and provisional items handout. Additional information provided at meeting with southern route proponents on 3 July 2012.

3 July 2012

July 2012

Direct cost comparisons including property information. Additional information provided at meeting with southern route proponents on 3 July 2012.

30 April 2012

April 2012

Q & A session southern Berry bypass review meeting notes- 30 April 2012.

19 March 2012

March 2012

Q & A session southern Berry bypass review meeting notes- 19 March 2012.

15 March 2012

March 2012

Meeting between Bruce Ramsay and Steve Zhivanovich to discuss design development of the southern suggestion.

1 March 2012

March 2012

Q & A session southern Berry bypass review meeting notes - 1 March 2012.

1 March 2012

March 2012

Meeting notes from updated southern Berry bypass route design - 1 March 2012.

16 February 2012

February 2012

Meeting notes from 16 February 2012.

15 February 2012

February 2012

Meeting notes from 15 February 2012.

31 January 2012

January 2012

Meeting notes from 31 January 2012.

24 January 2012

January 2012

Meeting notes from 24 Janaury 2012.

3 July 2012

July 2012

Southern Berry bypass review Q & A presentation - 3 July 2012.

30 April 2012

April 2012

Southern Berry bypass review Q & A presentation - 30 April 2012.

19 March 2012

March 2012

Southern Berry bypass review Q & A presentation - 19 March 2012.

1 march 2012

March 2012

Southern Berry bypass review Q & A presentation - 1 March 2012.

16 February 2012

February 2012

Southern Berry bypass review Q & A presentation - 16 February 2012.

Community Questions

July 2012

Responses to visitor enquiries at Berry project office and calls to 1800 project information line from 25 June to 6 July 2012.

Technical Investigation Group Overview

February 2012

Technical Investigation group overview.

Status Report 1

February 2012

Technical investigation group status report 1 - 24 February 2012.

16 May 2012

May 2012

16 May 2012 Technical Investigation Group meeting notes.

02 May 2012

May 2012

2 May 2012 Technical Investigation Group meeting notes.

26 April 2012

April 2012

26 April 2012 Technical Investigation Group meeting notes.

18 April 2012

April 2012

18 April 2012 Technical Investigation Group meeting notes.

4 April 2012

April 2012

4 April 2012 Technical Investigation Group meeting notes.

28 March 2012

March 2012

28 March 2012 Technical Investigation Group meeting notes.

21 March 2012

March 2012

21 March 2012 Technical Investigation Group meeting notes.

14 March 2012

March 2012

14 March 2012 Technical Investigation Group meeting notes.

7 March 2012

March 2012

7 March 2012 Technical Investigation Group meeting notes.

29 February 2012

February 2012

29 February 2012 Technical Investigation Group meeting notes.

21 February 2012

February 2012

21 February 2012 Technical Investigation Group meeting notes.

14 February 2012

February 2012

14 February 2012 Technical Investigation Group meeting notes.

3 February 2012

February 2012

3 February 2012 Technical Investigation Group meeting notes.

Submission

May 2012

Submission for southern route with balanced earthworks - strategic estimate.

Submission

May 2012

Submission for southern route with balanced earthworks - cross section pages 1- 29.

Submission

May 2012

Submission for southern route with balanced earthworks - cross section pages 30 - 58.

Submission

May 2012

Submission for southern route with balanced earthworks - plan.

Review Submission

December 2011

Resident submission to RMS about a possible southern Berry alternative.

Berry Bridge and Northern Interchange

Urban Design Draft Report

May 2012

Berry bridge and northern interchange urban design 80% draft report for comment. Presented to working group 2 May 2012.

Options for Comment

March 2012

Four shortlisted bridge designs, for community comment - 28 March 2012.

2 May 2012

May 2012

Berry bridge and northern interchange working group meeting notes - 2 May 2012.

Working Group Handouts

May 2012

Berry bridge and northern interchange working group handouts - 2 May 2012.

28 March 2012

March 2012

Berry bridge and northern interchange working group meeting notes - 28 March 2012.

7 March 2012

March 2012

Berry bridge and northern interchange working group meeting notes - 7 March 2012.

28 March 2012

March 2012

Berry bridge and northern interchange presentation - 28 March 2012.

28 March 2012

March 2012

Conebeare Morrison presentation - Berry Bridge and Norther Interchange precinct - 28 March 2012.

7 March 2012

March 2012

Berry bridge and northern interchange working group presentation - 7 March 2012.

7 March 2012

March 2012

Conebeare Morrison presentation - Berry bridge and northern interchange working group - 7 March 2012.

Kangaroo Valley Road interchange and Victoria Street precinct working group

Victoria Street Fact Sheet

August 2012

RMS is planning to close Victoria Street as part of the proposed Foxground and Berry bypass - Fact Sheet August 2012.

August 2012

August 2012

Proposed Victoria Street closure - August 2012.

Urban Design Report - Part 1

July 2012

Kangaroo Valley Road interchange and Victoria Street precinct urban design 80% report. Presented to working group 25 July 2012. Part 1

Urban Design Report - part 2

July 2012

Kangaroo Valley Road interchange and Victoria Street precinct urban design 80% report. Presented to working group 25 July 2012. Part 2

Option 1

July 2012

Victoria Street closed.

Option 2

July 2012

Victoria Street open to two way access.

Option 3

July 2012

Victoria Street open to one way access.

25 July 2012

July 2012

Kangaroo Valley Road and Victoria Street precinct - 25 July 2012.

23 May 2012

May 2012

Internal project team workshop meeting to discuss the preferred option for the purpose of the environmental assessment from the three design options for Victoria Street.

17 April 2012

April 2012

Kangaroo Valley Road and Victoria Street precinct - 17 April 2012.

29 March 2012

May 2012

Kangaroo Valley Road and Victoria Street precinct - 29 March 2012.

8 March 2012

March 2012

Kangaroo Valley Road and Victoria Street precinct - 8 March 2012.

January 2012

January 2012

Kangaroo Valley Road and Victoria Street precinct - Victoria Street discussions - January 2012.

Working Group Map A

May 2012

Kangaroo Valley Road interchange and Victoria Street precinct table working group maps for discussion - 16 May 2012.

Working Group Map B

May 2012

Kangaroo Valley Road interchange and Victoria Street precinct table working group maps for discussion - 16 May 2012.

Working Group Map C

May 2012

Kangaroo Valley Road interchange and Victoria Street precinct table working group maps for discussion - 16 May 2012.

RMS Presentation

25 July 2012

RMS Presentation.

17 April 2012

April 2012

Community member presentation - 17 April 2012

17 April 2012

April 2012

Kangaroo Valley Road, Mark Radium Park, Victoria Street presentation - 17 April 2012.

29 March 2012

March 2012

Conebeare Morrison presentation - Kangaroo Valley Road Interchange and Victoria Street - 29 March 2012.

29 March 2012

March 2012

Kangaroo Valley Road, Mark Radium Park, Victoria Street presentation - 29 March 2012.

8 March 2012

March 2012

Conebeare Morrison presentation - Kangaroo Valley Road and Victoria Street precinct - 8 March 2012.

8 March 2012

March 2012

Kangaroo Valley Road and Victoria Street precinct presentation - 8 March 2012.

RMS Traffic presentation

July 2012

Further data provided for the origin-destination surveys after the RMS presentation of traffic assessment of the Victoria Street design options, presented at the Berry Alliance community forum on 14 June 2012.

June 2012

June 2012

RMS traffic assessment of Victoria Street design options presented at a Berry Alliance community forum on 14 June 2012.

North Street precinct working group

Urban Design Draft Report

May 2012

North Street precinct urban design 80% draft report for comment. Presented to working group 14 May 2012.

14 May 2012

May 2012

North Street Precinct working group meeting notes - 14 May 2012.

2 April 2012

April 2012

North Street Precinct working group meeting notes - 2 April 2012.

29 February 2012

February 2012

North Street Precinct working group meeting notes - 29 February 2012.

14 May 2012

May 2012

North Street Precinct working group presentation - 14 May 2012.

2 April 2012

April 2012

Conebeare Morrison presentation - North Street Precinct working group - 2 April 2012.

2 April 2012

April 2012

North Street Precinct working group presentation - 2 April 2012.

2 April 2012

April 2012

North Street Precinct - study area for pedestrian bridge - 2 April 2012.

29 February 2012

February 2012

North Street Precinct working group presentation - 29 February 2012.

29 February 2012

February 2012

Conebeare Morrison presentaton - North Street precinct working group meeting - 29 February 2012.

Austral Park Road interchange and Heavy Vehicle Rest Area working group

Letter to Householder - Heavy Vehicle Rest Area no longer proposed

September 2012

Notification that a heavy vehicle rest area is no longer proposed at Austral Park Road.

16 April 2012 - Revised

April 2012

REVISED MEETING NOTES Austral Park Road and heavy vehicle rest area working group meeting notes - 16 April 2012.

16 April 2012

April 2012

Austral Park Road and heavy vehicle rest area working group meeting notes - 16 April 2012.

5 March 2012

March 2012

Austral Park Road and heavy vehicle rest area working group meeting notes - 5 March 2012.

16 April 2012

April 2012

Austral Park Road and heavy vehicle rest area working group presentation - 16 April 2012.

16 April 2012

April 2012

Austral Park Road Interchange options - 16 April 2012.

5 March 2012

March 2012

Austral Park Road and heavy vehicle rest area working group presentation - 5 March 2012.

Community review group

Berry Bypass Alignment Issues Report

January 2012

This report provides a summary and review of submissions received in response to the changes to the concept design for the Berry bypass resulting from the Berry community review group discussions.

Main Report

December 2011

This report documents the community review group option review process undertaken with Roads and Maritime Services.

Appendix 1 - Document List

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 2 - Bridge design workshops process report

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 3 - RMS Early 2011 Concept Design

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 4 - RMS Potential Alternative Alignments

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services

Appendix 5 - RMS Berry Bridge Options 1,2 & 3.

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 6 - North Street End Options A, B & C

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 7 - RMS Potential Alternative Routes

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 8 - Cross Section of possible lowered highway alignment at North Street

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 9 - BR1 Option - General Arrangement

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 10 - BR2 Option - General

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 11 - BR3 Option - General

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 12 - RMS Comparison of Options At North Street

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Appendix 13 - Revised Bypass Alignment

December 2011

These report appendices document the community review group option review process undertaken with Roads and Maritime Services.

Community Update

December 2011

The update include a map of the revised Berry bypass alignment including an urban design cross section from North Street to help show the changes and the measurements.

Huntingdale Park Road Design changes householder letter

December 2011

Project manager letter to residents showing the proposed concept design changes at Huntingdale Park Road Berry (south) interchange.

North Street Householder letter

December 2011

Project manager letter to residents. Pole indicators for noise wall erected along North Street.

Berry bypass option review householder letter

September 2011

Project manager letter to residents. Update for the Berry bypass preferred options review process.

Letter to residents

November 2011

The two urban design workshops scheduled for Tuesday 15 November 2011 have been cancelled.

Bridge Design Workshops Process Report

November 2011

Roads and Maritime Services DRAFT report - bridge design and northern interchange workshops.

Bridge Design Process Report Appendices

November 2011

Roads and Maritime Services DRAFT report - bridge design and northern interchange workshops - appendices.

Meeting Statement - Design Workshop 2

November 2011

Meeting statement - design workshop 2.

Meeting Statement - Design Workshop 1

October 2011

Meeting statement - design workshop 1.

Meeting statement 7

November 2011

Meeting Notes 7

November 2011

Meeting Statement 6

November 2011

Meeting Notes 6

November 2011

Meeting Statement - 5

October 2011

Meeting Notes 5

October 2011

Meeting Statement 4

October 2011

Meeting Notes 4

October 2011

Meeting Statement 3

September 2011

Meeting Statement 2

September 2011

Meeting Statement 1

August 2011

Berry bypass community meeting presentation

December 2011

Community meeting presentation showing the revised bypass alignment changes in comparison to the old design. Presentation also shows meeting objective, process of the review and next steps for the announcement.

Progress update presentation

November 2011

Roads and Maritime Services process update at community review group meeting no 7, showing proposed revised alignment.

Process update presentation

November 2011

RMS process update at community review group meeting No. 6.

Progress Update

November 2011

RMS presentation on progress update at community review group meeting no 6.

Urban Design possible North Street Alignments

November 2011

RMS Urban design presentation on various alignments close to North Street including cross sections at community review group meeting no. 6.

Berry Bridge & Berry North interchange workshop

October 2011

Progress update for Berry bridge and North Berry interchange design development.

Talking about North Berry Precinct

October 2011

Berry community review group - Talking about North Berry Precinct.

Berry bypass options review

October 2011

Roads and Maritime Services (Formerly Roads and Traffic Authority) presentation at Berry committee review group meeting no. 4.

Road Traffic Noise Presentation

September 2011

This presentation was given by community review group member (Acoustic engineer) Bob Fitzell to educate the group on road traffic noise.

Meeting Register

July 2013

Foxground and Berry bypass meeting register