Project documents

Richmond intersection improvements

August 2016

Richmond intersection improvements - Stage 2 Bells Line of Road and Grose Vale Road, North Richmond

Richmond Intersection Improvements

July 2016

Richmond Intersection Improvements - Stage 2 March Street and Bosworth Street, Richmond

Have Your Say Letter

November 2015

Letter to residents

October 2015

Letter to residents

September 2015

Letter to residents

August 2015

Letter to residents

June 2015

Letter to residents

February 2015

Community Update

September 2012

Richmond Bridge and approaches congestion study.

Community Update

July 2012

Richmond Bridge and approaches congestion study.

Value Management Workshop Nomination Form

September 2012

Richmond Bridge and Approaches - Value Management Workshop Nomination form.

Feedback Form

September 2012

Feedback form of the Richmond Bridge and approaches congestion study - long-term options report

Community Involvement Plan

July 2012

Community Involvement Plan

Reports

Community Consultation Report

August 2016

Richmond Intersection Improvements - Stage 2 - Bells Line of Road and Grose Vale Road, North Richmond

Community Consultation Report

July 2016

Richmond Intersection Improvements - Stage 2 Community Consultation Report

Community Consultation Report

February 2015

Executive Summary

February 2013

Part 1 of the volume provides an executive summary of the preferred options report, and includes glossary, table of contents for the report.

Introduction

February 2013

Part 2 of the volume provides introduction to study objectives, scope and methodology.

Short-term solutions Study

February 2013

Part 3 of the volume includes traffic analysis, potential solutions, community comments, responses to issues, recommendation of preferred short term solution and strategic layout plans for the preferred options.

Long-term Solutions Study

February 2013

Part 4 of the volume describes the option selection methodology, short listed options, environmental considerations, community consultation, value management process, assessment criteria & methodology and recommendation of the preferred option.

Appendix 1 - Community Issues Report (short-term study)

February 2013

Describes community involvement process, community comments and issues on short-term options

Appendix 2 - Road Safety audit report (Short Term study)

February 2013

Provides a report on the road safety audit carried out on the existing road conditions and the proposed improvements

Appendix 3 - Community Issues Report (Long Term Study)

February 2013

Provides a summary of the consultation, Community comments and issues and responses to community issues.

Appendix 4 - Value Management Report (Long-Term Study)

February 2013

Describes community feedbacks, community perspectives, list of participants, options assessment comments.

Appendix 5 - Proposed New Road Corridor

February 2013

Includes plans of the proposed road corridor.

Executive Summary

September 2012

Executive Summary.

1. Introduction

September 2012

Introduction

2. Design Objectives and Criteria

September 2012

Design Objectives and Criteria.

3. Project Development Process

September 2012

Project Development Process.

4. Route Selection Methodology

September 2012

Route Selection Methodology.

5. Community Consultation

September 2012

Community Consultation.

6. Technical Considerations

September 2012

Technical Considerations.

7. Environmental Considerations

September 2012

Environmental Considerations.

8. Social and Economic issues

September 2012

Social and Economic Issues.

9. Surface Water and Flooding

September 2012

Surface Water and Flooding

10. Land Use

September 2012

Land Use

11. Urban Design

September 2012

Urban design

12. Services and Public Utilities

September 2012

Services and public utilities

13. Construction and Maintenance Considerations

September 2012

Construction and maintenance considerations

14. Economic Analysis

September 2012

Economic analysis

15. Multi Criteria Consideration of Options

September 2012

Multi Criteria Consideration of Options.

16. Consideration of Options

September 2012

Consideration of Options

17. What Happens Next?

September 2012

What Happens Next?

Richmond Bridge Congestion Study - Community Issues Report

September 2012

Richmond Bridge Congestion Study - Community Issues Report

Summary Report - Volume 1 Part 1

July 2012

Stage 1 Summary Report - Volume 1 Part 1

Summary Report - Volume 1 Part 2

July 2012

Stage 1 Summary Report - Volume 1 Part 2

Volume 2- Appendix 1

July 2012

Stage 1 Summary Report - Volume 2

Volume 2- Appendix 2

July 2012

Bridge inspection and Structural Assessment.

Volume 2 - Appendix 3 - Part 1

July 2012

Traffic Analysis Report Volume 1.

Volume 2 - Appendix 3 - Part 2

July 2012

Traffic Analysis Report Volume 1 - Part 2.

Volume 2 - Appendix 4 - Part 1

July 2012

Traffic analysis report Volume 2.

Volume 2 - Appendix 4 - Part 2

July 2012

Options modelling results (turning volumes, sidra and paramics analysis).

Volume 2 - Appendix 5

July 2012

Strategic concept sketches of proposed short-term improvements.