Project documents

Out of hours work on Bringelly Road

June 2018

As part of The Northern Road and Bringelly Road upgrades, Roads and Maritime Services is carrying out electrical relocation work on Bringelly Road. Work will include removing existing power poles and wires and replacing them with new ones. To complete the work safely and to minimise the impact on road users, work will be take place on Saturday 2 June 2018 between 8am and 5pm, weather permitting.

Night work on The Northern Road, Oran Park

May 2018

Roads and Maritime Services will lay a temporary road surface on The Northern Road, Oran Park near Peter Brock Drive, traffic will be switched to the temporary road surface on Thursday 10 May 2018 to maintain the flow of traffic while the northbound carriageway is being widened. Work to lay the temporary road surface will take place at night between 8pm and 5am on Tuesday 8 May and Wednesday 9 May 2018, weather permitting.

Bridge work on The Northern Road, Bringelly

May 2018

Roads and Maritime Services is building a new bridge over Thompsons Creek as part of The Northern Road and Bringelly Road upgrades. This work will take place between 6am and 6pm from Tuesday 1 May to Friday 18 May 2018, weather permitting. During this period, there will be up to five nights where equipment for the work will be delivered to Thompsons Creek between midnight and 7am.

Community notification

April 2018

Out of hours work on Bringelly Road between Kelvin Park Drive, Bringelly and Masterfield Street, Rossmore Saturday 14 and 21 April 2018

Night work and traffic changes on Bringelly Road

March 2018

As part of The Northern Road and Bringelly Road upgrades, Roads and Maritime Services is carrying out utility work to relocate the watermains on Bringelly Road. To minimise the impact on motorists and residents, this work will take place at night between 8pm and 5am on Thursday 22 and Friday 23 March 2018, weather permitting.

Night work and traffic changes on Bringelly Road

January 2018

Roads and Maritime Services is carrying out work to build the new interchange at Bringelly, this work includes barrier installation, tree clearing, relocating services, piling and concreting. For the safety of motorists, Bringelly Road near Kelvin Park Drive and the intersection of The Northern Road will be closed until mid-2019 while we carry out this work. To minimise impacts to motorists a temporary access road will be built next to Bringelly Road for the duration of the closure and motorists will be diverted onto the access road.

Night work

November 2017

Piling and concreting will be carried out to build a new bridge over Thompsons Creek as part of The Northern Road and Bringelly Road upgrades. Piling work will generally be completed during standard construction hours between 7am and 6pm however concreting work will also be required at night between 6pm and 10pm from Monday 20 November to Wednesday 20 December 2017, weather permitting. During this period piling equipment will be delivered to and picked up from the site on up to three nights between midnight and 7am.

Utility work

July 2017

Roads and Maritime Services will be carrying out electrical relocation work as part of The Northern Road Upgrade from Peter Brock Drive, Oran Park to Mersey Road, Bringelly and the Bringelly Road Upgrade from King Street, Rossmore to The Northern Road, Bringelly.

Geotechnical investigation work

June 2017

From Peter Brock Drive, Oran Park to Mersey Road, Bringelly as well as the Bringelly Road Upgrade from King Street, Rossmore to The Northern Road, Bringelly.

Site compound setup

June 2017

Site compound set up for The Northern Road Upgrade from Peter Brock Drive, Oran Park, to Mersey Road, Bringelly as well as the Bringelly Road Upgrade from King Street, Rossmore, to The Northern Road, Bringelly from Thursday 22 June 2017

Electrical Work - The Northern Road Upgrade Stage 2

February 2017

Electrical adjustment work on The Northern Road, Bringelly from Friday 17 February

Survey investigations

November 2016

Survey investigations on The Northern Road from Peter Brock Drive to Mersey Road including Bringelly Road, from King Street to The Northern Road from Monday 7 November

Community update

July 2017

Community Update - The Northern Road Upgrade Stage 2

May 2015

Progress update on The Northern Road Stage 2

Community Update - The Northern Road Upgrade Stage 1 and 2

October 2012

Community Updates about Concept Design and REF - October 2012.

Community Update - The Northern Road Upgrade Stage 1 and 2

November 2011

Community updates about Preliminary Concept Design - November 2011.

Community Update - The Northern Road Upgrade Stage 1 and 2

July 2010

Community update about Access Strategy, July 2010.

The Northern Road Upgrade Stage 1 and 2 – Community Consultation Report – June 2012

The Northern Road Upgrade - The Old Northern Road to Mersey Road. Preliminary Concept Design - Community consultation report June 2012.

The Northern Road Upgrade Stage 1 and 2 – Community Consultation Report – March 2011

Community consultation report Access Strategy - March 2011.

The Northern Road Upgrade Stage 1 and 2 - REF Submissions Report - Main Report

March 2013

Appendix A

March 2013

Appendix A - Consultation as part of the REF

Appendix B

March 2013

Appendix B UBM Cobbitty Road ecological assessment

Appendix C Property Impact Schedule and Drawings Part 1

March 2013

Appendix C Property Impact Schedule and Drawings part 1.

Appendix C Drawings Part 2

March 2013

Appendix C Revised property impact drawings part 2.

Appendix C Drawings Part 3

March 2013

Appendix C Revised property impact drawings part 3.

Appendix C Drawings Part 4

March 2013

Appendix C Revised property impact drawings part 4.

Appendix C Drawings Part 5

March 2013

Appendix C Revised property impact drawings part 5.

Appendix C Drawings Part 6

March 2013

Appendix C Revised property impact drawings part 6.

Appendix C Drawings Part 7

March 2013

Appendix C Revised property impact drawings part 7.

The Northern Road Upgrade Stage 1 and 2 - Review of Environmental Factors (REF) - Main Report - Executive Summary

October 2012

Executive Summary

Main Report - Section 1

October 2012

Introduction

Main report - Section 2

October 2012

Needs and Options considered.

Main Report - Section 3

October 2012

Description of the proposal.

Main Report - Section 4

October 2012

Statutory and planning framework.

Main Report - Section 5

October 2012

Stakeholder and community consultation.

Main Report - Section 6

October 2012

Environmental Assessment.

Main report - Section 7

October 2012

Environmental Management.

Main report - Section 8

October 2012

Conclusion

Main report - Section 9

October 2012

Certification

Main Report - Section 10

October 2012

References.

Appendix A

October 2012

Concept Design

Appendix B

October 2012

Hydrology

Appendix C - Part 1

October 2012

Proposed property acquisition - Part 1.

Appendix C - Part 2

October 2012

Proposed property acquisition - Part 2.

Appendix C - Part 3

October 2012

Proposed property acquisition - Part 3.

Appendix C - Part 4

October 2012

Proposed property acquisition - Part 4.

Appendix C - Part 5

October 2012

Proposed property acquisition - Part 5.

Appendix C - Part 6

October 2012

Proposed property acquisition - Part 6.

Appendix C - Part 7

October 2012

Proposed property acquisition - Part 7.

Appendix D

October 2012

Biodiversity

Appendix E

October 2012

Non-Aboriginal Heritage

Appendix F

October 2012

Consideration of clause 228(2) Factors and matters of national environmental significance.

Appendix G

October 2012

Consultation

Appendix H

October 2012

Aboriginal Heritage

Appendix I - Part 1

October 2012

Urban Design - Part 1.

Appendix I - Part 2

October 2012

Urban Design - part 2.

Appendix J - Part 1

October 2012

Traffic - part 1.

Appendix J - Part 2

October 2012

Traffic - Part 2.

Appendix J - Part 3

October 2012

Traffic - Part 3.

Appendix K

October 2012

Noise Assessment.

Appendix L

October 2012

Air quality.

Addendum

October 2015

The Northern Road and Bringelly Road Interchange

Bridge work on The Northern Road, Bringelly

May 2018

Roads and Maritime Services is building a new bridge over Thompsons Creek as part of The Northern Road and Bringelly Road upgrades. This work will take place between 6am and 6pm from Tuesday 1 May to Friday 18 May 2018, weather permitting. During this period, there will be up to five nights where equipment for the work will be delivered to Thompsons Creek between midnight and 7am.

Letter to residents

June 2016

The Northern Road / Bringelly Road Interchange – Submissions Report for the Review of Environmental Factors and Concept Design now available

Community Update - The Northern Road and Bringelly Road Interchange

November 2015

Roads and Maritime Services is inviting your comments on the concept design and Review of Environmental Factors.

Community Update - The Northern Road and Bringelly Road Interchange

July 2015

About the proposed interchange.

Questions and Answers - The Northern Road and Bringelly Road Interchange

July 2015

Options Report – The Northern Road and Bringelly Road Interchange Upgrade

July 2015

Community Consultation Report

October 2015

Appendix A

Consideration of clause 228(2) factors and matters of environmental significance

Appendix B

Information on options considered

Appendix C

Concept design drawings

Appendix D

Traffic and transport assessment

Appendix E

Noise and vibration assessment

Appendix F

Biodiversity assessment

Appendix G

Aboriginal Heritage Assessment

Appendix H

Non-Aboriginal Heritage Assessment

Appendix I

Urban Design Report and Lanascape Character and Visual Impact Assessment

Appendix J

Socio-economic assessment

Appendix K

Western Sydney Infrastructure Plan Community Consultation Report

Appendix L

ISEPP Consultation

Submission Report

May 2016

Appendix C - Aboriginal Cultural Heritage Assessment

May 2016

Share this page: