Sydney region

Project documents

RMS Road Projects website strives where possible to ensure all documents comply with WCAG 2.0. If you are having trouble accessing information in a document, please contact us on Project_Customer_Services@rms.nsw.gov.au.

To open or download documents, 'right-click' on the title for PC and 'control-click' on the title for Mac and choose an option. Get more help with downloading and viewing documents

Community information

Reports

  • Bridge Design Evaluation Report

    File Date Description File Size
    PDFBridge design evaluation report April 2013 This report details the process for arriving at the preferred bridge design for the Nepean River Green Bridge. 17MB
  • Draft Preliminary Bridge Design Options Report - September 2012

    File Date Description File Size
    PDFMain report September 2012 Main report 6MB
    PDFAppendix A September 2012 TfNSW - Traffic and Transport report 4MB
    PDFAppendix B September 2012 Hassell design option 4MB
    PDFAppendix C September 2012 KI Studio design option 9MB
    PDFAppendix D September 2012 CM+ design option 3MB
    PDFAppendix E September 2012 RMS Bridge Engineering Option - Cable Stay Bridge 848KB
    PDFAppendix F September 2012 RMS Bridge Engineering Option - Steel I Girder Bridge 2MB