Community information
Project updates
File | Title | Size |
---|---|---|
January to March 2021 project update | 4.25Mb | |
October to December 2020 project update | 1Mb | |
July to September 2020 project update | 1.44Mb | |
April to June 2020 project update | 1.22Mb | |
January to March 2020 project update | 848Kb | |
July 2019 project update
July to September look ahead. |
844Kb | |
June 2019 project update
Batemans Bay foreshore designs. |
1.06Mb | |
April 2019 project update
April to June 2019 look ahead. |
1.2Mb | |
December 2018 project update
January to March 2019 look ahead. |
429Kb | |
December 2018 project update
Detailed design update. |
1.03Mb | |
August 2018 project update
Finalising the design and starting early work |
290Kb |
Project notifications
File | Title | Size |
---|---|---|
December 2020 project notification
Widening vehicle turn-around area in Clyde Street west, Batemans Bay |
502Kb | |
December 2020 project notification
Both Batemans Bay town boat ramps will be open during the peak holiday period |
501Kb | |
October 2020 project notification
Out of hours work for segment installation and bridge finishing works from Monday 2 November to mid 2021 |
584Kb | |
October 2020 project notification
Temporary traffic access arrangements for Wharf Road over the Spring and Summer holiday period |
436Kb | |
September 2020 project notification
Opening of temporary side track and traffic changes at Clyde Street west Batemans Bay in September 2020. |
876Kb | |
September 2020 project notification
We have updated our plan to maintain Clyde River boat ramp access during construction of the Batemans Bay Bridge replacement project. |
476Kb | |
September 2020 project notification
Introduction of new 12 metre vertical height limit for Clyde River marine vessels at Batemans Bay Bridge. |
190Kb | |
June 2020 project notification
Out of hours work for concrete pouring. |
302Kb | |
May 2020 project notification
Temporary 90 minute closures of Clyde Street west boat ramp |
177Kb | |
May 2020 project notification
Proposed out of hours concrete bridge segment production from 18 May 2020 to late 2020. |
369Kb | |
May 2020 project notification
Out of hours work for segment erection until mid 2021. |
492Kb | |
April 2020 project notification
Extension of standard work hours due to COVID-19 pandemic. |
265Kb | |
April 2020 project notification
Access Changes to Wharf Road and Old Punt Road for motorists and pedestrians. |
1.6Mb | |
February 2020 project notification
Out of hours transport of concrete bridge segments on the Princes Highway. |
298Kb | |
December 2019 letter to residents
Proposed out of hours concrete bridge segment production from 11 January 2020 to September 2020. |
148Kb | |
2019 extension letter to residents
Bridge piling work including possible out of hours work - from Wednesday 23 October 2019. |
217Kb | |
November 2019 notification letter
Night work planned to relocate utilities and remove medians on Princes Highway, north of Batemans Bay Bridge. |
125Kb | |
November 2019 notification letter
Night work planned to remove medians and carry out electrical work on Princes and Kings Highways at Batemans Bay. |
225Kb | |
September 2019 project notification
Temporary pedestrian changes at Old Punt Road. |
482Kb | |
August 2019 project notification
Out of hours work on the Princes Highway at Batemans Bay on 19 and 20 August 2019 and opening of temporary new road. |
201Kb | |
July 2019 project notification
Out of hours concrete segment production for bridge constructionfrom July 2019to June 2020 |
247Kb | |
May 2019 project notification
Bridge piling work including possible out of hours work from Monday 6 May 2019. |
379Kb | |
March 2019 project notification
Permanent traffic changes to make way for construction of the new Batemans Bay Bridge. |
142Kb | |
March 2019 project notification
Temporary construction siteto build concrete segments for the Batemans Bay Bridge replacement project, south of Mogo. |
231Kb | |
December 2018 project notification
We’re providing access to Clyde River for boat users at all times during major work by relocating the boat rampat Old Punt Road. |
647Kb |
Community updates
File | Title | Size |
---|---|---|
Community update October to December 2019
Work planned for 3 months October to December 2019 |
1.43Mb | |
May 2018 community update
Submissions report. |
811Kb | |
September 2017 community update
Batemans Bay Bridge replacement. |
283Kb | |
August 2017 community update
Preferred option for the Batemans Bay Bridge replacement. |
895Kb |
Letter to residents
File | Title | Size |
---|---|---|
October 2018 letter to residents
Work on temporary project offices for the Batemans Bay Bridge replacement project planned from 19 November. |
159Kb | |
October 2018 letter to residents
Utility work is planned around the Clyde River foreshore area starting 22 October to December 2018. |
211Kb |
Reports
Consistency Reviews
File | Title | Size |
---|---|---|
Consistency review overview
Batemans Bay Bridge replacement. |
25.1Kb | |
Consistency review 1 - Kings Highway slip lanes and utility adjustment works
Batemans Bay Bridge replacement. |
4.74Mb | |
Consistency review 2 - Temporary boat ramp
Batemans Bay Bridge replacement. |
8.07Mb | |
Consistency review 3 - Detailed design changes
Batemans Bay Bridge replacement. |
32.9Mb | |
Consistency review 4 - Pier 1 temporary working platform and temporary Bailey bridge
Batemans Bay Bridge replacement. |
2.52Mb | |
Consistency review 5 - Stockpile on Kings Highway
Batemans Bay Bridge replacement. |
1.3Mb |
Environmental Assessment
File | Title | Size |
---|---|---|
November 2017 environmental assessment overview
Batemans Bay Bridge replacement |
14.98Mb |
Summary of recommendations from the Foreshore Advisory Committee
File | Title | Size |
---|---|---|
June 2019 aummary of feedback from the Foreshore Advisory Committee
Batemans Bay Bridge replacement project. |
260Kb |
Environmental Impact Statement (EIS)
File | Title | Size |
---|---|---|
November 2017 Environmental impact statement report
Main report. |
46.7Mb | |
Appendix C
Biodiversity assessment. |
35.1Mb | |
Appendix D
Aboriginal Cultural Heritage Assessment. |
4.29Mb | |
Appendix E
Hydrology and coastal processes assessment. |
35.98Mb | |
Appendix F
Soils and Geology Assessment. |
27.2Mb | |
Appendix G
Operational Water Quality Assessment. |
4.61Mb | |
Appendix H
Traffic and Transport Assessment. |
3.19Mb | |
Appendix I
Noise and Vibration Assessment. |
24.8Mb | |
Appendix J
Urban design report and landscape character and visual impact assessment. |
16.8Mb |
Review of Environmental Factors (REF)
File | Title | Size |
---|---|---|
Batemans Bay Bridge Replacement Adddendum REF Floating Pontoon - May 2020 | 14.8Mb | |
Batemans Bay Bridge Replacement project Review of environmental factors consistency review 6 - precast ancillary facility boundary adjustment | 6.98Mb | |
March 2019 addendum review of environmental factors 2
Batemans Bay Bridge replacement – precast ancillary facility. |
5.64Mb | |
September 2018 addendum review of environmental factors
Batemans Bay Bridge replacement – former bowling clubhouse demolition. |
3.04Mb | |
May 2018 submissions report
Review of environmental factors submissions report. |
57.2Mb | |
November 2017 Review of environmental factors
Main report |
63.03Mb | |
Appendix C
Urban design report and landscape character and visual impact assessment. |
16.8Mb | |
Appendix D
Biodiversity assessment. |
35.1Mb | |
Appendix E
Hydrology and coastal processes assessment |
35.98Mb | |
Appendix F
Soils and Geology Assessment |
27.2Mb | |
Appendix G
Operational Water Quality Assessment. |
4.61Mb | |
Appendix H
Aboriginal Cultural Heritage Assessment. |
4.29Mb | |
Appendix I
Noise and Vibration Assessment |
24.8Mb | |
Appendix J
Traffic and Transport Assessment. |
3.19Mb | |
Appendix K
Socio-economic impact assessment |
1.57Mb | |
Appendix L
Assessment and Statement of Heritage Impact. |
5.37Mb |
Preferred option information
File | Title | Size |
---|---|---|
August 2017 preferred route option report
Batemans Bay Bridge |
1.94Mb | |
Preferred options faq's | 192Kb |