Gerringong to Bomaderry - Princes Highway upgrade: document library

Preferred option development

Design and planning reports

Show filesHide files
File Title Size
December 2009 oral history

Transcripts from the oral history recordings for the Gerringong to Bomaderry Princes Highway upgrade.

1.73Mb
June 2009 Toolijooa Ridge preferred option report – Addendum One to the preferred option report

The route optimisation process identified two route options crossing the Toolijooa Ridge by different means.

2.14Mb
June 2009 Gerringong and Berry preferred access arrangements report

This report is a summary of design developments for the access arrangements for Gerringong and Berry.

1.76Mb
June 2009 access options submissions summary report

This report provides an overview of the consultation program and a summary and review of the 972 submissions received in response to the display of the access options.

2.39Mb
March 2009 sustainability factors, climate change and economic appraisal

This report presents the findings of further work conducted following an ecologically sustainable development workshop in December 2007.

4.12Mb
February 2009 access value management workshop report

Value management report for the access options at Gerringong and Berry.

1.69Mb

Preferred option report

Show filesHide files
File Title Size
October 2008 preferred option report

This document has been developed to explain the preferred option development process.

12.5Mb

Community updates

Show filesHide files
File Title Size
December 2010 community update

Foxground and Berry bypass - Princes Highway.

2.05Mb
November 2009 community update

Princes Highway upgrade - Gerringong to Bomaderry.

54.2Kb
June 2009 community update

Gerringong to Bomaderry - Princes Higwhay upgrade.

6.89Mb
October 2008 community update

Gerringong to Bomaderry.

5.42Mb

Letters to the householder

Show filesHide files
File Title Size
March 2009 letter to the householder

Gerringong to Bomaderry Princes Highway upgrade.

92.4Kb

Maps

Show filesHide files
File Title Size
October 2008 Ground conditions

Map showing acid sulfate soils and ground conditions identified during the preferred option process.

5.03Mb
October 2008 Land use

Map showing land-use categorisation identified during the preferred option process.

1,018Kb
October 2008 Daily traffic

Map showing predicted daily traffic patterns identified during the preferred options process.

1.5Mb
October 2008 Heritage in Gerringong

Map showing areas of heritage significance For Gerringong identified during the preferred option process.

132Kb
October 2008 Flooding and drainage in Gerringong

Map showing the 1 in 100 year flood limit for Gerringong township as identified during the preferred option process.

175Kb
October 2008 Mobility and community amenity in Gerringong

Map showing mobility and community amenity in Gerringong as identified during the preferred option process.

161Kb
October 2008 Heritage in Berry

Map showing areas of heritage significance for Berry identified during the preferred option process.

187Kb
October 2008 Heritage in Berry - Pulman Street

Map showing areas of heritage significance in the Pulman Street precinct identified during the preferred option process.

2.85Mb
October 2008 Flooding and drainage in Berry

Map showing the 1 in 100 year flood limit for Berry township as identified during the preferred option process.

323Kb
October 2008 Mobility and Community Amenity in Berry

Map showing mobility and community amenity in Berry as identified during the preferred option process.

179Kb
October 2008 Traffic - existing turning movements in Berry

Map showing existing traffic movements in Berry township as identified during the preferred option process.

421Kb

 

Route options development

Design and planning reports

Show filesHide files
File Title Size
September 2008 route options submissions report

This report provides an overview of the issues raised from 996 submissions received in response to the project’s route options development report and public display of seven feasible options

2.49Mb
September 2008 fog monitoring

Key findings from fog monitoring which occurred for a period of 12 months as part of the route options development process from October 2007 to October 2008.

725Kb
May 2008 value management report

Value management workshop report

578Kb

Route Options Development Report

Show filesHide files
File Title Size
November 2007 route options development report

Table of contents and Executive summary.

641Kb
Chapter 1

Introduction

348Kb
Chapter 2

Strategic context.

2.23Mb
Chapter 3

Community and stakeholder involvement.

3.27Mb
Chapter 4

Statutory and strategic planning.

1.19Mb
Chapter 5

The existing environment.

12.1Mb
Chapter 6

Design considerations.

48.9Kb
Chapter 7

Development of route options.

1.18Mb
Chapter 8

Description of short listed route options.

1.53Mb
Chapter 9

Project cost, economic analysis and safety.

65.9Kb
Chapter 10

Summary of next steps.

13.2Kb
Appendix A

Route Options Workshop Findings.

7.37Mb
Appendix B

Preliminary Geotechnical Report (Part A).

10.8Mb
Appendix B - part A

Engineering Logs and Core Photographs For Geotechnical Boreholes Part A.

12.5Mb
Appendix B - part B

Engineering Logs and Core Photographs For Geotechnical Boreholes Part B.

19.1Mb
Appendix B - part C

Engineering Logs and Core Photographs For Geotechnical Boreholes Part C

14.1Mb
Appendix B - part D

Engineering Logs for Test Pits.

14.2Mb
Appendix B - part E

Electric Piezocone Plots and Pore Pressure Dissipation Tests Part A.

10.5Mb
Appendix B - part F

Electric Piezocone Plots and Pore Pressure Dissipation Tests Part B.

13.5Mb
Appendix B - part G

Geological Mapping Results.

3.79Mb
Appendix B - part H

Geotechnical Laboratory Test Results Part A.

8.75Mb
Appendix B - part I

Geotechnical Laboratory Test Results Part B.

13.8Mb
Appendix B - part J

Point Load Test Results.

160Kb
Appendix B - part K

Previous Relevant Borehole Logs Part A.

15.1Mb
Appendix B - part L

Previous Relevant Borehole Logs Part B.

7.43Mb
Appendix B - part M

Preliminary Geotechnical Report (Part B).

15.2Mb
Appendix B - part N

Preliminary Geotechnical Report (Part C).

5.87Mb
Appendix C - part A

Preliminary Urban and Regional Design Strategy Part A

15.4Mb
Appendix C - part B

Preliminary Urban and Regional Design Strategy Part B.

2.38Mb
Appendix D

Preliminary Traffic Assessment Report.

3.75Mb
Appendix E

Preliminary Public Utilities and Services Report.

1.97Mb
Appendix F

Preliminary Social Economic Impacts Report.

1.6Mb
Appendix G - part A

Preliminary Biological Report (Terrestrial Flora and Fauna) Part A.

6.26Mb
Appendix G - part B

Preliminary Biological Report (Terrestrial Flora and Fauna) Part B.

8.84Mb
Appendix G - part C

Preliminary Biological Report (Terrestrial Flora and Fauna) Part B.

4.17Mb
Appendix H

Preliminary Biological Report (Aquatic Ecology and Water Quality Management)

5.48Mb
Appendix I - part A

Preliminary Indigenous and Non-Indigenous Heritage Assessment Part A

3Mb
Appendix I - part B

Preliminary Indigenous and Non-Indigenous Heritage Assessment Part B

8.99Mb
Appendix I - part C

Preliminary Indigenous and Non-Indigenous Heritage Assessment Part C

5.01Mb
Appendix J

Preliminary Air Quality Management Report.

7.22Mb
Appendix K - part A

Preliminary Flooding and Drainage Report Part A.

1.11Mb
Appendix K - part B

Preliminary Flooding and Drainage Report Part B.

6.31Mb
Appendix L

Preliminary Planning and Zoning Issues Report.

1.98Mb
Appendix M - part A

Preliminary Land Use Issues Report Part A.

2Mb
Appendix M - part B

Peliminary Land Use Issues Report Part B.

2.63Mb
Appendix M - part C

Preliminary Land Use Issues Report Part C.

524Kb
Appendix M - part D

Preliminary Land Use Issues Report Part D.

317Kb
Appendix M - part E

Preliminary Land Use Issues Report Part E.

905Kb
Appendix M - part F

Preliminary Land Use Issues Report Part F.

1.07Mb
Appendix N

Preliminary Traffic Noise and Vibration Assessment Report.

2.8Mb
Appendix O

Preliminary Property Impacts Report.

4.95Mb
Appendix P

Preliminary Climatic Assessment Report.

1.5Mb
Appendix Q

Preliminary Cumulative Effects Report.

957Kb
Appendix R

Road Safety Audit - Stage 1, Route Options - Preliminary Concept Design.

2.17Mb

Peer Review

Show filesHide files
File Title Size
May 2008 peer review

Route optimisation peer review - Connell Wagner report 2008.

258Kb

Community updates

Show filesHide files
File Title Size
November 2007 community update

Gerringong to Bomaderry option display.

6.4Mb
July 2007 community update

Gerringong to Bomaderry.

367Kb
April 2007 community update

Gerringong to Bomaderry.

829Kb
January 2007 community update

Gerringong to Bomaderry.

2.66Mb

Letters to the householder

Show filesHide files
File Title Size
June 2008 letter to the householder

Decision making for the Princes Highway Gerringong to Bomaderry.

103Kb

Maps

Show filesHide files
File Title Size
November 2007 long list of route options

Map of all route options.

1.05Mb
November 2007 cultural heritage

Map showing areas of heritage significance identified during the route options development process.

943Kb
November 2007 traffic patterns

Map showing existing peak hour traffic patterns identified during the route options development process.

1.01Mb
November 2007 flooding and drainage

Map showing 1 in 100 year flood limits identified during the route options development process.

3.79Mb
November 2007 flora and fauna

Map showing threatened flora and fauna species identified during the route options development process.

1.41Mb
November 2007 ground conditions

Map showing acid sulfate soils and ground conditions identified during the route options development process.

1.51Mb
November 2007 land use

Map showing land-use categorisation identified during the route options development process.

723Kb
November 2007 public utilities

Map showing major public utilities identified during the route options development process.

530Kb
November 2007 planning and zoning

Map showing planning and zoning land classifications identified during the route options development process.

955Kb

Community consultation

Show filesHide files
File Title Size
April 2007 meeting notes

Interest group information 2007

41.3Kb
February 2007 presentation

Interest group information session presentation

1.18Mb
February 2007 meeting notes

Community information session meeting notes

216Kb
February 2007 presentation

Information session – introduction to the project team and project progress

1.18Mb

 

Pre-2007 and previous studies

Planning focus meeting

Show filesHide files
File Title Size
October 2006 meeting report

Summary of key issues raised at the Gerringong to Bomaderry Princes highway upgrade planning focus meeting 29 September 2006.

117Kb

Community updates

Show filesHide files
File Title Size
September 2006 community update

Gerringong to Bomaderry.

1Mb
March 2006 community update

Gerringong to Bomaderry.

2.17Mb

Community consutlation

Show filesHide files
File Title Size
June 2006 community consultation report

Community consultation report.

79.9Kb
May 2006 meeting notes

Workshop meeting notes.

116Kb
May 2006 presentation

Community involvement in the development of route options for the upgrade of the Princes Highway between Gerringong and Bomaderry.

993Kb

Value management work report - 1996

Show filesHide files
File Title Size
March 1996 Princes Highway Berry bpass project value management study report

Report on the value management workshop held on 13 and 14 March 1996. This study was part of a process that was terminated in 1998 by the then NSW Government.

2.87Mb

Previous studies

Show filesHide files
File Title Size
September 2006 Quantm study

What is the Quantm study?

579Kb
September 2006 Berry bypass study

Review of the 1996 Berry bypass study.

207Kb
September 2006 Gerringong to Berry route study

Review of the route evaluation study undertaken in 1991 for the Princes Highway from Gerringong to Berry.

197Kb

 

Share this page: