Clarence River crossing at Grafton

New Grafton bridge - additional crossing of the Clarence River

The NSW Government is funding this $240 million project which involves building an additional 525 metre bridge 70 metres downstream from the existing road and rail bridge. The project also includes upgrading parts of the road network in Grafton and South Grafton to connect the new bridge to the existing road network. The new bridge will consist of two lanes but has been designed to be increased to four lanes when traffic levels require it.

Latest news

SEP 2020

SEP 2020Community update

The latest community update (PDF, 2.19Mb) for the new Grafton bridge project is available.

Bridge opening

The new Grafton bridge opened to traffic on Thursday 12 December.

Find out more about the new traffic arrangements.

Read our frequently asked questions.

New Grafton bridge community day

Thousands of people turned out to walk across the bridge on Sunday 8 December.

Final segment placed

The project reached a major milestone in August with the placement of the final bridge segment.

With the last of the 176 pre-cast segments in place, there is now a 525-metre continuous span from the southern bank to the northern bank of the Clarence River.

3D animation

How the bridge will look once complete

See how the bridge will look once complete and check out other digital information about the project.

Project information

The new $240 million Grafton bridge recently open to traffic, with a number of new traffic changes in place.

Key building activities planned between January and March 2020 include:

  • Continue building the roundabout at the intersection of the Pacific and Gwydir highways in South Grafton
  • Continue landscaping
  • Reinstate the flood levee wall on the northern embankment of the Clarence River 
  • Reopen Greaves Street to through traffic
  • Start building the central concrete median on Iolanthe Street, South Grafton.

To safely carry out these activities traffic management including stop/slow traffic control, road shoulder closures and reduced speed limits may be required.

 

  • Contractors: Fulton Hogan
  • Form of contract: Design and construct contract
  • Start date of major construction: November 2016
  • Expected completion date: 2019 (weather permitting)
  • Project value: $240 million.
  • Enhance road safety for all road users over the length of the project
  • Improve traffic efficiency between and within Grafton and South Grafton
  • Support regional and local economic development
  • Involve all stakeholders and consider their interests
  • Provide value for money
  • Minimise impact on the environment.

Developing a new flood model

Flood mitigation

View the new video about the work to minimise the impact on flooding.

Project documents

Project notifications

Show filesHide files
File Title Size
May 2020 project notification

Traffic changes in South Grafton from Tuesday 26 May 2020.

347Kb
September 2019 project notification

Work to improve the roundabout at the intersection of Dobie and Villiers streets from Monday 16 September 2019.

266Kb
August 2019 project notification

Work outside of normal construction hours for the new Grafton bridge.

275Kb
August 2019 project notification

Work to improve the roundabout at the intersection of Villiers and Pound streets.

74.5Kb
March 2019 project notification

Work ramps up on the northern side of the Clarence River as part of the new Grafton Bridge project.

239Kb
April 2019 project notification

Work outside of normal construction hours for the new Grafton Bridge.

315Kb
April 2019 project notification

Work outside of normal construction hours for the Pound Street rail bridge from 8 April to 12 May 2019.

128Kb
January 2019 project notification

New access road linking South Grafton and the Pacific Highway to open 18 January 2019.

278Kb
December 2018 project notification

Work outside of normal construction hours for the new Grafton bridge project.

126Kb
November 2018 project notification

Pound Street temporarily reduced to one lane between Kent and Bridge streets from Monday 19 November 2018.

261Kb
July 2018 project notification

Ongoing out of hours work for precast yard.

122Kb
May 2018 project notification

Changed traffic arrangements for Clarence and Pound streets.

265Kb
April 2018 project notification

Publication of operational noise reports.

43.8Kb
April 2018 project notification

The New Grafton bridge project operational noise - frequently asked questions.

56.5Kb

Project updates

Show filesHide files
File Title Size
August 2020 project update

New Grafton bridge.

2.19Mb
February 2020 project update

New Grafton bridge.

1.19Mb
September 2019 project update

New Grafton bridge.

0
May 2019 project update

New Grafton Bridge - Pound Street rail bridge.

1.56Mb
February 2019 project update

New Grafton Bridge.

1.32Mb

Reports

Show filesHide files
File Title Size
Operational noise report

Design and construction of additional crossing of the Clarence River at Grafton.

12.2Mb
March 2018 detailed noise modelling assessment report

Clarence River bridge crossing.

7.6Mb

 

Contact us

For more information about this project, please contact:

Phone: (02) 6640 1331

Email: grafton.regional.office@transport.nsw.gov.au

Mail: PO Box 576, Grafton NSW 2460