The documents listed within are from 2017 and earlier and relate to the new Grafton bridge project. Other current documents can be accessed via the project documents - current webpage for the new Grafton bridge project.
Community information
Project notifications
File | Title | Size |
---|---|---|
December 2017 project notification
Work outside of normal construction hours for the new Grafton bridge project. |
474Kb | |
November 2017 project notification
Change to Clarence River navigation channel at Grafton. |
142Kb | |
November 2017 project notification
Work outside of normal construction hours for the new Grafton bridge project. |
637Kb | |
October 2017 project notification
Work outside of normal construction hours for the new Grafton bridge. |
59.5Kb | |
October 2017 project notification
Out of hours work for the new Grafton bridge. |
58.6Kb | |
October 2017 project notification
Vegetation removal at the intersection of Villiers and Pound streets, Grafton. |
54.1Kb | |
September 2017 project notification
Permanent closure of a section of Kent Street |
453Kb | |
August 2017 project notification
Truck routes for Grafton bridge project. |
441Kb | |
August 2017 project notification
Out of hours work for the Pound Street rail bridge |
86.6Kb | |
August 2017 project notification
Out of hours work for vegetation removal in Clarence Street, Grafton. |
87.5Kb | |
June 2017 project notification
Out of hours work to relocate utility services in Villiers, Pound, Kent, Clarence and Greaves streets, Grafton. |
66.4Kb | |
May 2017 project notification
Out of hours work for the Pound Street rail bridge on the June long weekend. |
68.96Kb | |
April 2017 project notification
Start of work in the Clarence River as part of the Grafton bridge project. |
80.7Kb | |
March 2017 project notification
Temporary jetty construction on the Clarence River foreshore inSouth Grafton. |
86.98Kb | |
March 2017 project notification
Establishment of a precast facility in South Grafton. |
406Kb | |
February 2017 project notification
Closure ofPound and Greaves streets |
368Kb | |
February 2017 project notification
Embankment construction and services relocation in South Grafton. |
63.5Kb | |
January 2017 project notification
Establishment of Pound Street ancillary facility. |
144Kb | |
September 2016 project notification
Work on the new Grafton Bridge project starting in September 2016. |
68.4Kb | |
June 2015 project notification
Out of hours work for Charles Street (Gwydir Highway) early work. |
20.6Kb | |
February 2015 project notification
Charles Street early work. |
20.5Kb |
Project updates
File | Title | Size |
---|---|---|
October 2017 project update
New Grafton bridge. |
1.81Mb | |
July 2017 project update
New Grafton bridge project update |
551Kb | |
April 2017 project update
Grafton Bridge project update |
2.63Mb | |
November 2016 project update
Grafton Bridge. |
137Kb | |
August 2016 project update
Grafton Bridge. |
60.8Kb | |
January 2016 project update
Update on activities taking place on the project to prepare for major work to start. |
190Kb | |
September 2015 project update
Update on activities for the project and map of key features. |
1.87Mb | |
May 2015 project update
Additional crossing of the Clarence River at Grafton |
299Kb | |
February 2015 project update
Charles Street early work. |
20.5Kb | |
December 2014 project update
Additional crossing of Clarence River, Grafton. |
699Kb | |
August 2014 project update
Environmental impact statement display. |
87.5Kb |
Community updates
File | Title | Size |
---|---|---|
November 2016 community updates
New Grafton Bridge. |
1.05Mb | |
November 2013 community update
Preliminary concept design. |
5.28Mb | |
September 2013 community update
Concept design and preparing an environmental impact statement for a new bridge over the Clarence River at Grafton. |
37.3Kb | |
April 2013 community update
Preferred option display. |
1.45Mb | |
December 2012 community update
Recommended preferred option display |
1.78Mb | |
October 2012 community update
A summary on the value management workshop and the outcomes. |
133Kb | |
September 2012 community update
Route Options Display. |
7.63Mb | |
January 2012 community update
Additional crossing of the Clarence river at Grafton. |
632Kb | |
October 2011 community update
Preliminary Route Options Report - Part 2 |
932Kb | |
June 2011 community update
Additional crossing of the Clarence River at Grafton. |
2.2Mb | |
December 2010 community update
Additional crossing of the Clarence River at Grafton. |
1.13Mb | |
February 2010 community update
Summerland Way, Grafton. |
993Kb | |
April 2004 community update
Additional Crossing of the Clarence River Grafton - Summerland Way. |
919Kb | |
September 2003 community update
Planning for a new bridge in the Grafton area. |
75.6Kb | |
December 2002 community update
Feasibility Study additional crossing of the Clarence River. |
610Kb |
Letter to residents
File | Title | Size |
---|---|---|
March 2012 letter to residents
Geotechnical field investigations letter - river bank |
30.1Kb | |
March 2012 letter to residents
Geotechnical field investigations letter - Lawrence Road. |
30.1Kb | |
February 2011 letter to residents
Additional crossing of the Clarence River at Grafton |
53.9Kb | |
January 2011 letter to residents
Website update and consultation activities planned in February to March 2011. |
46.5Kb | |
December 2010 letter to residents
Additional crossing of the Clarence River at Grafton. |
72.5Kb | |
December 2010 letter to residents
Additional crossing of the Clarence River at Grafton. |
71.3Kb | |
December 2010 letter to residents
Additional crossing of the Clarence River at Grafton. |
77.1Kb | |
December 2010 letter to residents
Mr Higgins' letter (extract from December 2010 community update) |
69.1Kb | |
December 2009 letter to residents
New crossing of the Clarence River at Grafton – consultation resumes |
96.7Kb |
Frequently Asked Questions (FAQs)
File | Title | Size |
---|---|---|
April 2017 frequently asked questions
New Grafton bridge project questions. |
87.4Kb |
Posters and displays
File | Title | Size |
---|---|---|
April 2013 display panel
Preferred option display. |
817Kb | |
December 2012 display panel
Recommended preferred option display. |
930Kb | |
September 2012 display panel
Additional crossing of the Clarence River at Grafton. |
932Kb | |
January 2012 display panel
Short-listed options to go forward for further investigation. |
392Kb | |
October 2011 display panel
Preliminary Route Options Report - Part 2. |
466Kb | |
June 2011 display panel
Additional crossing of the Clarence River at Grafton. |
990Kb |
Forms
File | Title | Size |
---|---|---|
September 2012 value management workshop nomination form | 163Kb | |
October 2011 evaluation workshop form
Nomination to attend the evaluation workshop. |
168Kb |
Factsheets
File | Title | Size |
---|---|---|
August 2017 piling fact sheet
Information on how the project will build the land and river piles. |
1.05Mb | |
August 2017 dust fact sheet
Information on how the project manages dust during construction. |
619Kb | |
June 2017 maritime fact sheet
Information for river users during construction. |
2.23Mb | |
November 2016 developing the new flood model fact sheet
The new flood model for the Clarence River at Grafton, incorporating the new bridge. |
623Kb | |
December 2011 how is noise addressed fact sheet
How Roads and Maritime Services assesses and reduces traffic noise. |
1.52Mb | |
December 2011 property acquisition fact sheet
Property acquisition. |
1.26Mb | |
December 2011 field investigation property access
Field investigation property access. |
640Kb |
Media releases
Community meetings
Public meetings, presentation and notes
Community focus group minutes and presentations
Reports
Community communication strategy
File | Title | Size |
---|---|---|
July 2016 community communication strategy report
Additional crossing of the Clarence River at Grafton. |
2.16Mb |
Construction compliance report
File | Title | Size |
---|---|---|
July 2017 construction compliance report 1
Construction Compliance Report - October 2016 to April 2017. |
3.27Mb |
Construction environmental management plan
File | Title | Size |
---|---|---|
September 2016 construction environmental management plan
Main report |
39.3Mb | |
Appendix B1
Traffic and access management plan |
2.52Mb | |
Appendix B2
Flora and fauna management plan |
8.77Mb | |
Appendix B3
Noise andvibration management plan |
2.77Mb | |
Appendix B4
Soil and water quality management plan |
14.5Mb | |
Appendix B5
Heritage management plan |
7.28Mb | |
Appendix B6
Construction air quality management plan |
498Kb | |
Appendix B7
Waste and energy management plan |
455Kb | |
Appendix B8
Flood management plan |
997Kb | |
Appendix B9
Contaminated land management plan |
1.88Mb |
Department of Environmental referral
File | Title | Size |
---|---|---|
May 2016 Department of Environmental referral
Correpondence re: Referral of proposed action |
1.04Mb | |
Attachment 1
Figures 1-10 |
1.85Mb | |
Attachment 1
Figures 11-20 |
3.04Mb | |
Attachment 1
Figures 21-31 |
2.75Mb | |
Flood mitigation fact sheet | 962Kb | |
Three-toed Snake Tooth Skink construction management plan | 3.59Mb | |
Infrastructure approval | 131Kb | |
Significance assessment for Three-toed Snake Tooth Skink | 1.69Mb |
Submissions report
File | Title | Size |
---|---|---|
October 2014 submissions report
Environmental impact statement |
2.29Mb |
Environmental Impact Statement
File | Title | Size |
---|---|---|
August 2014 environmental impact statement report
EIS Main Report Part 1 |
4.78Mb | |
August 2014 environmental impact statement report
EIS main report Part 2 |
6.13Mb | |
August 2014 environmental impact statement report
EIS main report Part 3 |
1.63Mb | |
Appendix A
Director-General’s requirements and checklist |
138Kb | |
Appendix B
Environmental Planning and Assessment Regulation 2000 checklist |
81.1Kb | |
Appendix C
Draft community consultation strategy |
263Kb | |
Appendix D
Traffic and transport |
4.13Mb | |
Appendix E – Part 1
Flooding and hydrology assessment Part 1 |
6.52Mb | |
Appendix E – Part 2
Flooding and hydrology assessment Part 2 |
4.04Mb | |
Appendix F
Noise and vibration assessment |
6.77Mb | |
Appendix G – Part 1
Non-Aboriginal heritage assessment part 1 |
4.28Mb | |
Appendix G – Part 2
Non-Aboriginal heritage assessment part 2 |
6.2Mb | |
Appendix G – Part 3
Non-Aboriginal heritage assessment part 3 |
6.71Mb | |
Appendix G – Part 4
Non-Aboriginal heritage assessment part 4 |
965Kb | |
Appendix G – Part 5
Non-Aboriginal heritage assessment part 5 |
6.29Mb | |
Appendix G – Part 6
Non-Aboriginal heritage assessment part 6 |
5.84Mb | |
Appendix H – Part 1
Aboriginal heritage assessment part 1 |
4.97Mb | |
Appendix H – Part 2
Aboriginal heritage assessment part 2 |
6.39Mb | |
Appendix H – Part 3
Aboriginal heritage assessment part 3 |
5.57Mb | |
Appendix I
Socio-economic assessment |
3.51Mb | |
Appendix J – Part 1
Urban design and landscape concept report part 1 |
3.9Mb | |
Appendix J – Part 2
Urban design and landscape concept report part 2 |
6.21Mb | |
Appendix J – Part 3
Urban design and landscape concept report part 3 |
5.63Mb | |
Appendix K
Levee works landscape and visual appraisal – reduced scope |
18.8Mb | |
Appendix L
Flora and fauna assessment |
6.37Mb |
Community survey and report
File | Title | Size |
---|---|---|
October 2012 draft route options community feedback report
Community feedback received on the display of the Route Options Development Report. |
590Kb | |
June 2011 online business survey report
This is a report of an online survey of businesses conducted with the co-operation of the Grafton Chamber of Commerce and Industry (GCCI). |
2.7Mb | |
May 2011 telephone survey report
Telephone survey of Clarence Valley residents between 14 and 21 March 2011. |
2.26Mb | |
April 2011 postal survey feedback report
Postal survey December 2010 to March 2011 Feedback report. |
1.6Mb | |
February 2011 community suggestions map
Community suggestions map. |
372Kb | |
February 2011 summary of postal survey feedback
Summary of postal survey feedback. |
116Kb | |
December 2010 initial community survey
Extract from December 2010 community update. |
562Kb |
Feasibility assessment report
File | Title | Size |
---|---|---|
June 2011 feasibility assessment report
Main report |
4.16Mb | |
Appendix A
Route suggestions. |
9.29Mb | |
Appendix B
Route suggestions shown in strategic corridors. |
9.29Mb | |
Appendix D
Feasibility assessment workshop outcomes. |
4.14Mb | |
Appendix E
Comparative strategic cost estimates. |
174Kb | |
February 2003 feasibility study report
Feasibility study report. |
3.96Mb |
Traffic study reports
File | Title | Size |
---|---|---|
March 2011 traffic study report
Heavy vehicle traffic study summary. |
536Kb | |
March 2011 traffic study report
Heavy vehicle traffic study report |
5.99Mb | |
January 2009 traffic study brief
Variations to Traffic Study Brief |
79.3Kb | |
December 2008 traffic study brief
Traffic Study Brief for 2009 Investigation. |
462Kb | |
July 2007 South Grafton traffic study brief
South Grafton Traffic Study Brief |
921Kb | |
February 2010 traffc study report
Traffic study report. |
1.6Mb | |
December 2009 traffc study report
Traffic study report. |
4.71Mb | |
February 2009 traffc study report
South Grafton traffic study report |
0 |
Preferred options report
File | Title | Size |
---|---|---|
April 2013 preferred option submission report
Additional crossing of the Clarence River at Grafton. |
3.39Mb | |
December 2012 recommended preferred option report
Main report. |
5.29Mb | |
December 2012 recommended preferred option report - Appendix 1
Route Options Submissions Report. |
1.24Mb | |
December 2012 recommended preferred option report - Appendix 2
Value Management Option Selection Workshop. |
4.47Mb | |
December 2012 recommended preferred option report - Appendix 3
Option assessment workshop. |
6.32Mb | |
December 2012 recommended preferred option report - Appendix 4
Second option assessment workshop. |
2.97Mb | |
June 2005 draft preferred options report
Part 1 to recommend a preferred location for an additional crossing of the Clarence River at Grafton. |
9.09Mb | |
June 2005 draft preferred options report
Second part of the draft Preferred option report. |
5.6Mb | |
June 2005 draft preferred options report
Third part of the draft Preferred option report. |
9.06Mb | |
June 2005 draft preferred options report
Fourth part of the draft Preferred option report. |
3.84Mb | |
June 2005 draft preferred options report
Fifth part of the draft Preferred option report. |
23.7Mb | |
June 2005 draft preferred options report
Sixth part of the draft Preferred option report. |
3.48Mb | |
June 2005 draft preferred options report
Final part of the draft Preferred option report. |
7.57Mb |
Route Options Development report
File | Title | Size |
---|---|---|
September 2012 main report - Volume 1
Part 1, Chapter1 – 4.12 describes the assessment of the six route options. |
3.92Mb | |
September 2012 main report - Volume 1
Part 2, Drawings includes preliminary concept designs maps for the six route options. |
10.3Mb | |
September 2012 main report - Volume 1
Part 3, Chapter 5 - 7 and appendices describes the assessment of the six route options. |
5.19Mb | |
September 2012 Volume 2
Traffic Assessment Technical Paper. |
11Mb | |
September 2012 Volume 2
Social and Economic Technical Paper. |
4.73Mb | |
September 2012 Volume 2
Strategic Cost Estimates Technical Paper |
923Kb | |
September 2012 Volume 2
Economic Evaluation Technical Paper |
2.02Mb | |
September 2012 Volume 2
Noise Assessment Technical Paper |
6.67Mb | |
September 2012 Volume 2
Aboriginal Heritage Technical Paper |
6.91Mb | |
September 2012 Volume 2
Non-Aboriginal Heritage Technical Paper |
7.42Mb | |
September 2012 Volume 3
Ecology Technical Paper |
7.36Mb | |
September 2012 Volume 3
Landscape and Urban Character Technical Paper. |
6.77Mb | |
September 2012 Volume 3
Flooding Technical Paper |
6.27Mb | |
September 2012 Volume 3
Geotechnical Assessment Technical Paper |
6.63Mb | |
March 2013 UNSW route options development report
Peer Review |
872Kb | |
March 2012 supplementary route options report
Final report |
210Kb | |
January 2012 preliminary route options report - final
Volume 1 Main Report, Part 1 |
6.89Mb | |
January 2012 preliminary route options report - final
Volume 1 Main Report, Parts 2 and 3 |
2.28Mb | |
January 2012 preliminary route options report - final
Volume 1 Main Report, Appendices 1 to 3 includes previous studies, design criteria and community feedback. |
1.28Mb | |
January 2012 preliminary route options report - final
Volume 1 Main Report, Appendix 4, corridors 1-2 includes preliminary route options drawings for corridors 1 and 2. |
8.97Mb | |
January 2012 preliminary route options report - final
Volume 1 Main Report, Appendix 4, corridors 3-4 includes preliminary route options drawings for corridors 3 and 4. |
7.24Mb | |
January 2012 preliminary route options report - final
Volume 1 Main Report, Appendix 4, corridor 5 includes preliminary route options drawings for corridor 5. |
3.77Mb | |
January 2012 preliminary route options report - final
Volume 1 Main Report, Appendices 5 - 7 includes preliminary route options constraint mapping, community and stakeholder evaluation workshop and community feedback. |
3.34Mb | |
November 2011 preliminary route options report
Volume 2, Strategic Traffic Assessment Technical Paper |
11.2Mb | |
August 2011 preliminary route options report
Volume 2, Landscape and Urban Character Technical Paper (Part A) |
11.2Mb | |
August 2011 preliminary route options report
Volume 2, Landscape and Urban Character Technical Paper (Part B) |
5.87Mb | |
January 2012 preliminary route options report
Volume 2, Social and Economic Technical Paper |
7.8Mb | |
August 2011 preliminary route options report
Volume 2, Aboriginal Heritage Technical Paper |
4.98Mb | |
August 2011 preliminary route options report
Volume 2, Non-Aboriginal Heritage Technical Paper |
6.35Mb | |
August 2011 preliminary route options report
Volume 2, Ecology Technical Paper |
4.79Mb |
Community consultation report
File | Title | Size |
---|---|---|
January 2004 interim community consultation report
Full report |
2.16Mb | |
January 2004 interim community consultation report
Executive summary |
103Kb |
Technical review of Inland corridor
File | Title | Size |
---|---|---|
September 2006 technical review of inland corridor
Question and Answer Sheet |
811Kb | |
September 2006 technical review of inland corridor
Main report |
2.2Mb | |
Appendix A
Proposals on inland alternatives |
1.82Mb | |
Appendix B
Pages 1 to 15. |
77.9Kb | |
Appendix B
Pages 16 to 19. |
1.61Mb | |
Appendix B
Pages 20 to 22. |
1.61Mb | |
Appendix B
Page 23. |
305Kb | |
Appendix C
Report on project cost. |
290Kb | |
Appendix D
Comparative assessment of the longitudinal sections of the inland alternatives and the Pacific Highway upgrade. |
472Kb |
Environmental overview
File | Title | Size |
---|---|---|
January 2004 environmental overview
Volume 1 |
1.22Mb | |
Volume 2 Appendix A
Project legal and zoning issues |
2.75Mb | |
Volume 2 Appendix B
Community participation report |
2.52Mb | |
Volume 2 Appendix C
Traffic Study and Economic Analysis |
1.29Mb | |
Volume 2 Appendix D
Land Use Issues |
631Kb | |
Volume 2 Appendix E
Social and Economic Impacts Report |
712Kb | |
Volume 2 Appendix F
Geotechnical Investigation Report |
480Kb | |
Volume 2 Appendix G
Hydrology |
368Kb | |
Volume 2 Appendix H
Water Quality Assessment |
5.4Mb | |
Volume 2 Appendix I
Ecological assessment |
1.44Mb | |
Volume 2 Appendix J
Non-Indigenous Heritage Assessment |
1.52Mb | |
Volume 2 Appendix K
Indigenous Heritage Assessment |
1.84Mb | |
Volume 2 Appendix L
Noise Assessment |
5.82Mb | |
Volume 2 Appendix M
Air Quality Assessment |
4.69Mb | |
Volume 2 Appendix N
Short Listing Workshop |
4.47Mb |
Plans
Community liaison plan
File | Title | Size |
---|---|---|
November 2013 community liaison plan
Updated community liaison plan. |
361Kb | |
September 2012 community liaison plan
Updated community liaison plan. |
281Kb | |
December 2010 community liaison plan
Updated community liaison plan. |
194Kb | |
July 2010 community liaison plan
Community liaison plan |
158Kb |
Urban design and landscape plan
File | Title | Size |
---|---|---|
November 2016 Urban design and landscape plan
Chapters 1 - 5 |
15.4Mb | |
November 2016 Urban design and landscape plan
Chapters 6 - 8 |
6.72Mb | |
November 2016 Urban design and landscape plan
Appendices |
11.9Mb |
Community consultation plan
File | Title | Size |
---|---|---|
September 2003 community consultation plan
Community Participation Plan. |
87.5Kb |
Project managers reports
Project managers updates
File | Title | Size |
---|---|---|
September 2012 project managers update
Visual representations from the detailed traffic modelling |
39.3Kb | |
September 2012 project managers update
Route Options Development Report |
24.4Kb | |
June 2012 project managers update
Six short-listed options announced. |
33.5Kb | |
March 2012 project managers update
Six options have been short-listed in the work to identify a preferred option. |
53.6Kb | |
January 2012 project managers update
Six options are short-listed to go forward for further investigation. |
43.7Kb | |
December 2011 project managers update
Community and stakeholder evaluation workshop |
26.9Kb | |
November 2011 project managers update
Workshop statement. |
18.6Kb | |
November 2011 project managers update
Evaluation workshop. |
18.04Kb | |
October 2011 project managers update
Preliminary Route Options Report - Parts 1 and 2. |
18.01Kb | |
August 2011 project managers update
Preliminary Route Options Report |
16.4Kb | |
August 2011 project managers update
Interactive maps are now available |
18.4Kb | |
August 2011 project managers update
Preliminary Route Options Report Part 1. |
18.1Kb | |
July 2011 project managers update
Community forums. |
30.5Kb | |
June 2011 project managers update
The Feasibility Assessment Report. |
16.8Kb | |
May 2011 project managers update
Telephone survey. |
15.2Kb | |
April 2011 project managers update
Postal survey. |
16.8Kb | |
March 2011 project managers update
Community forums. |
39.3Kb | |
March 2011 project managers update
Community forums. |
27.7Kb | |
February 2011 project managers update
Postal survey. |
24.8Kb |
Other documents
2004 route options map
File | Title | Size |
---|---|---|
April 2004 route options map
Grafton, Clarence River crossing. |
2.9Mb |
2004 Corridor evaluation workshop report
File | Title | Size |
---|---|---|
April 2004 corridor evaluation workshop report
Corridor Evaluation workshop report |
537Kb |
Summary of community discussions
File | Title | Size |
---|---|---|
January 2011 summary of community discussions
Summary of community discussions February 2010 to November 2010 |
407Kb |
Statement of heritage impact
File | Title | Size |
---|---|---|
March 2005 statement of heritage impact
Statement of heritage impact |
5.45Mb | |
August 2016 additional archival recording of heritage items report
Additional archival recording of heritage items. |
7.03Mb | |
July 2016 archival recording of heritage items report
Archival recording of heritage items |
31.5Mb |
Proposed road levels
File | Title | Size |
---|---|---|
September 2017 proposed road levels
Proposed road levels |
12.1Mb |
Biodiversity Gap Field Survey
File | Title | Size |
---|---|---|
March 2016 biodiversity gap field survey
Biodiversity Gap Field Survey |
2.77Mb |