Project documents

Community information

Community updates

Show filesHide files
File Title Size
May 2016 community update

Tooleybuc Bridge update.

3.96Mb
October 2015 community update

Tooleybuc Bridge replacement – preferred option.

2.67Mb
May 2014 community update

Replacement of Tooleybuc Bridge.

2.13Mb
November 2013 community update

Replacement of Tooleybuc Bridge.

5.45Mb

 

Reports

Preliminary Environmental Investigation Report (PEI)

Show filesHide files
File Title Size
September 2015 PEI Main report

NSW Preliminary Environmental Investigation Report and Victorian Planning Assessment Report

4.6Mb
Appendix A

Hydrology report

12.4Mb
Appendix B

Noise and vibration report

16.9Mb
Appendix C

Socio-economic report

7.47Mb
Appendix D

Biodiversity Report

23.2Mb
Appendix E

Urban Design Report

23.4Mb
Appendix F

Aboriginal Cultural and Heritage Report

6.85Mb

Environmental Constraints Analysis (ECA)

Show filesHide files
File Title Size
May 2014 main report

Environmental Constraints Analysis (ECA)

7.08Mb
Appendix A

Biodiversity Constraints Report

7.39Mb
Appendix B

Aboriginal Cultural Heritage Constraints Report

7.67Mb
Appendix C

Non Aboriginal Heritage Constraints Report

7.18Mb
Appendix D

Contamination Constraints Report

10.8Mb
Appendix E

Geotechnical Constraints Report

4.78Mb

 

Share this page: