Project documents

Community information

Construction updates

Show filesHide files
File Title Size
October 2019 construction update

Windsor Bridge replacement project.

210Kb
September 2019 construction update

Windsor Bridge replacement project.

178Kb
August 2019 construction update

Windsor Bridge replacement project.

203Kb
July 2019 construction update

Windsor Bridge replacement project.

316Kb
June 2019 construction update

Windsor Bridge replacement project.

216Kb
March 2019 construction update

Windsor Bridge replacement project.

212Kb
November 2018 construction update

Windsor Bridge replacement project.

175Kb
November 2018 construction update

Monthly construction activities - November 2018.

349Kb

Project updates

Show filesHide files
File Title Size
August 2019 project update

Windsor Bridge replacement project.

353Kb
December 2016 project update

Windsor Bridge replacement project.

3.62Mb
August 2016 project update

Windsor Bridge replacement project.

1.43Mb
March 2016 project update

Windsor Bridge replacement project.

4.38Mb
May 2012 project update

Windsor Bridge replacement project.

5.14Mb

Project notifications

Show filesHide files
File Title Size
March 2019 project notification

Temporary traffic changes from Monday 25 March 2019.

240Kb
September 2018 project notification

Line marking, from Monday 24 September 2018.

174Kb
September 2018 project notification

Major work starting on Windsor Bridge replacement from 24 September 2018.

159Kb
August 2018 project notification

Site compound setup for Windsor Bridge replacement project from Monday 20 August 2018.

135Kb
August 2018 project notification

Archaeological work on the Windsor Bridge replacement project from Thursday 16 August 2018.

388Kb
June 2018 project notification

Maritime archaeology work on Hawkesbury River, Windsor from Tuesday 3 July 2018.

126Kb
January 2018 project notification

Windsor Bridge Replacement Project – additional archaeological investigations.

157Kb
January 2018 project notification

Night work on Macquarie Street, Windsor from Monday 29 January 2018.

200Kb
December 2017 project notification

Windsor Bridge replacement salvage work continues.

177Kb
May 2016 project notification

Temporary site compound establishment from Monday 6 June 2016.

461Kb
April 2016 project notification

Environmental and heritage surveys and monitoring at Windsor Bridge and Thompson Square, Windsor from Monday 11 April 2016.

434Kb
April 2013 project notification

Inspections and survey work for the Windsor Bridge replacement project commencing 8 April 2013.

0
April 2012 project notification

Archaeological and geotechnical investigations for the Windsor Bridge replacement project starting Monday 23 April 2012.

97.2Kb
June 2011 project notification

Windsor Bridge, Windsor - 40km/h truck and bus speed limit - commencing Tuesday 14 June 2011.

124Kb

Community updates

Show filesHide files
File Title Size
May 2018 community update

Windsor Bridge replacement project.

294Kb
March 2018 community update

Windsor Bridge replacement project - Archaeological investigations.

5.34Mb
September 2017 community update

Windsor Bridge replacement project.

879Kb
March 2017 community update

Windsor Bridge replacement project – Urban Design and Landscape Plan.

404Kb
November 2012 community update

Windsor Bridge Replacement.

3.04Mb
August 2011 community update

Windsor Bridge over the Hawkesbury River.

3.5Mb
July 2009 community update

Windsor Bridge over the Hawkesbury River.

989Kb

Frequently Asked Questions (FAQs)

Show filesHide files
File Title Size
February 2017 frequently asked questions

Windsor Bridge replacement project.

147Kb
December 2016 frequently asked questions

Windsor Bridge replacement project.

37.9Kb

 

Reports

Environmental Impact Statement (2012)

Show filesHide files
File Title Size
December 2013 instrument of approval

Infrastrucutre approval signed.

2.37Mb
November 2012 environmental impact statement report

Executive Summary - volume 1

3.25Mb
November 2012 environmental impact statement report

Chapter 1 - Introduction.

3.94Mb
November 2012 environmental impact statement report

Chapter 2 - Assessment process.

33.8Kb
November 2012 environmental impact statement report

Chapter 3 - Strategic justification and project need.

88.7Kb
November 2012 environmental impact statement report

Chapter 4 - Project development alternatives.

9.08Mb
November 2012 environmental impact statement report

Chapter 5 - Part 1 - Project description - Part 1.

9.04Mb
November 2012 environmental impact statement report

Chapter 5 - Part 2 - Project description - Part 2.

5.53Mb
November 2012 environmental impact statement report

Chapter 6 - Consultation.

107Kb
November 2012 environmental impact statement report

Chapter 7 - Part 1 - Assessment of key issues - State and local historic heritage and maritime heritage.

4.39Mb
November 2012 environmental impact statement report

Chapter 7 - Part 2 - Assessment of key issues - Aboriginal heritage.

1.36Mb
November 2012 environmental impact statement report

Chapter 7 - Part 3 - Assessment of key issues - Traffic and transport.

2.09Mb
November 2012 environmental impact statement report

Chapter 7 - Part 4 - Visual amenity, urban design and landscape.

5.43Mb
November 2012 environmental impact statement report

Chapter 7 - Part 5 - Assessment of key issues - Noise and vibration.

6.94Mb
November 2012 environmental impact statement report

Chapter 7 - Part 6 - Assessment of key issues - Soil, sediments, water and waste.

2.56Mb
November 2012 environmental impact statement report

Chapter 7 - Part 7 - Assessment of key issues - Hydrology.

524Kb
November 2012 environmental impact statement report

Chapter 7 - Part 8 - Assessment of key issues - Land use, property and socio-economic.

198Kb
November 2012 environmental impact statement report

Chapter 7 - Part 9 - Assessment of key issues - Flora and fauna.

3.16Mb
November 2012 environmental impact statement report

Chapter 7 - Part 10 - Assessment of key issues - Air quality.

96.6Kb
November 2012 environmental impact statement report

Chapter 8 - Assessment of other issues.

69.8Kb
November 2012 environmental impact statement report

Chapter 9 - Environmental risk analysis.

52.1Kb
November 2012 environmental impact statement report

Chapter 10 - Environmental management measures.

104Kb
November 2012 environmental impact statement report

Chapter 11 - Project justification and conclusion.

72.9Kb
November 2012 environmental impact statement report

Chapter 12 - References.

58.8Kb
November 2012 environmental impact statement report

Appendices A and B.

52.6Kb
November 2012 environmental impact statement report

Appendix C1 - Technical reports on the condition of existing Windsor Bridge

8.4Mb
November 2012 environmental impact statement report

Appendix C2 - Bridge over Hawkesbury River at Windsor - Load Testing

2.96Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 1

3.43Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 2

6.43Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 3

5.2Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 4

6.42Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 5

2.06Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 6

6.24Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 7a.

3.67Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 7b

3.41Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 7c

7.37Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 7d

5.48Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 8a

5.41Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 8b

5.02Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 8c

4.64Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 9a

9.12Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 9b

7.14Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 9c

3.69Mb
November 2012 environmental impact statement report

Historic heritage working paper - Part 10

242Kb
November 2012 environmental impact statement report

Maritime heritage working paper - Part 1

8.01Mb
November 2012 environmental impact statement report

Maritime heritage working paper - Part 2

5.39Mb
November 2012 environmental impact statement report

Maritime heritage working paper - Part 3

5.55Mb
November 2012 environmental impact statement report

Maritime heritage working paper - Part 4

2.93Mb
November 2012 environmental impact statement report

Maritime heritage working paper - Part 5

7.25Mb
November 2012 environmental impact statement report

Maritime heritage working paper - Part 6

2.3Mb
November 2012 environmental impact statement report

Aboriginal heritage working paper - Part 1

5.05Mb
November 2012 environmental impact statement report

Aboriginal heritage working paper - Part 2

7.42Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 1

2.44Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 2

5.4Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 3

6.24Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 4

8.62Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 5

7.09Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 6

5.11Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 7

6.2Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 8

4.14Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 9

8.81Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 10

8.21Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 11

8.58Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 12

2.14Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 13

4.14Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 14

6.49Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 15

8.58Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 16

6.56Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 17

3.21Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 18

1.36Mb
November 2012 environmental impact statement report

Urban design and landscape working paper - Part 19

7.91Mb
November 2012 environmental impact statement report

Working paper 4 - Traffic and transport - Part 1

7.48Mb
November 2012 environmental impact statement report

Working paper 4 - Traffic and transport - Part 2

2.78Mb
November 2012 environmental impact statement report

Working paper 4 - Traffic and transport - Part 3

5.38Mb
November 2012 environmental impact statement report

Working paper 6 - Noise and vibration - Part 1

5.53Mb
November 2012 environmental impact statement report

Working paper 6 - Noise and vibration - Part 2

1.28Mb
November 2012 environmental impact statement report

Working paper 6 - Noise and vibration - Part 3

9.33Mb
November 2012 environmental impact statement report

Working paper 6 - Noise and vibration - Part 4

7.3Mb
November 2012 environmental impact statement report

Working paper 6 - Noise and vibration - Part 5

244Kb
November 2012 environmental impact statement report

Working paper 7 - Soil, sediment, water and waste

8.7Mb
November 2012 environmental impact statement report

Working paper 8 - Hydrology

7.9Mb
November 2012 environmental impact statement report

Working paper 9 - Land use, property and socio-economic

3.86Mb
November 2012 environmental impact statement report

Working paper 10 - Flora and fauna - Part 1

3.86Mb
November 2012 environmental impact statement report

Working paper 10 - Flora and fauna - Part 2

7.28Mb
November 2012 environmental impact statement report

Working paper 11 - Air quality

4.2Mb
November 2012 environmental impact statement report

Thompson Square alternatives working paper

401Kb

Submissions report (2013)

Show filesHide files
File Title Size
May 2013 submissions report

Windsor Bridge submissions PIR to CH 3

3.1Mb
May 2013 submissions report

Windsor Bridge submissions PIR to CH 2

2.74Mb
May 2013 submissions report

Windsor Bridge submissions PIR to CH 4

4.1Mb
May 2013 submissions report

Windsor Bridge submissions PIR to CH 5

3.22Mb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix B

1Mb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix B Attachment 1

2.49Mb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix B Attachment 2

1.77Mb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix B Attachment 3

1.3Mb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix B Attachment 4

2.26Mb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix C

622Kb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix D

1.98Mb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix E

2.61Mb
May 2013 submissions report

Windsor Bridge submissions PIR Appendix F - G

3.77Mb

Approvals

Show filesHide files
File Title Size
Signed approval from DPIE of the design and location of Flood Warning Signs

Design and location of Flood Warning Signs.

65.4Kb
Signed approval from DPIE of the operational noise mitigation measures

Operational noise mitigation measures.

63.5Kb
July 2019 compliance tracking program

Windsor Bridge.

887Kb
May 2019 Approval of Addendum

Ancillary Facility Assessment: Condition C9

455Kb
March 2019 Approval of revised Construction Traffic Management Plan (CTMP)

Construction Traffic Management Plan (CTMP)

216Kb
November 2018 replacement approval alternate heritage manager 189Kb
May 2018 Approval of Interpretation Plan (Stage 1) 85Kb
May 2016 Approval of the nominated Co-Excavation Directors 545Kb
March 2016 Approval of the proposed Archaeological Heritage Consultant team and Hawkesbury Region Sand Bodies Study 207Kb
May 2018 Approval of Maritime Salvage Works 134Kb
August 2018 Approval of the Sandy Body Research Design 166Kb
September 2018 Approval compliance tracking program 397Kb
September 2018 Approval construction noise vibration sub-plan 602Kb
September 2018 Approval construction heritage management sub-plan 722Kb
September 2018 Approval CEMP, FFMP, SWMP,TMP 503Kb
September 2018 Approval community communications strategy 504Kb
September 2018 Approval ancillary facility assessment 391Kb
July 2018 Approval alternate heritage manager 427Kb
July 2018 Approval alternate environmental representative 391Kb
May 2018 Approval revised design condition B8 1.03Mb
May 2018 Approval Thompson Square conservation area interpretation plan 237Kb
May 2018 Approval heritage manager 124Kb
March 2018 Approval maritime salvage 456Kb
February 2018 Approval strategic consultation management plan 225Kb
February 2018 Approval of detailed archival recording 186Kb
December 2017 Approval detailed salvage strategy 163Kb
September 2017 Approval salvage works area 1 1,005Kb
August 2017 Approval water quality management program 447Kb
July 2016 Approval Aboriginal investigation program 1.91Mb
June 2016 Approval non-Aboriginal investigation program 209Kb
April 2016 Approval environment representative 167Kb
April 2016 Approval alternative environmental representative 354Kb
October 2016 Approval modify Aboriginal archaeology investigation program 211Kb

Compliance Tracking reports

Show filesHide files
File Title Size
August 2019 compliance tracking report

Compliance Tracking Report (April to June 2019) Rev B

821Kb
July 2019 compliance tracking report

Compliance Tracking Report (January to March 2019) Rev D

909Kb
July 2019 compliance tracking report

Windsor Bridge replacement project.

616Kb
May 2019 compliance tracking report

Compliance Tracking Report (September to December 2018) Rev D

814Kb

Construction Environmental Management Plan

Show filesHide files
File Title Size
September 2018 construction environmental management plan

Windsor Bridge Replacement Project.

12.8Mb
March 2019 construction environmental management plan

Appendix B1: Construction Traffic Management Sub-Plan

10.9Mb
September 2018 construction environmental management plan

Appendix B2: Construction Flora and Fauna Management Plan

6.05Mb
September 2018 construction environmental management plan

Appendix B3: Construction Noise and Vibration Management Plan

1.61Mb
September 2018 construction environmental management plan

Appendix B4: Construction Soil and Water Management Plan

11.4Mb
September 2018 construction environmental management plan

Appendix B5: Construction Heritage Management Plan

5.84Mb
September 2018 construction environmental management plan

Appendix B6: Construction Air Quality Management Plan

584Kb
September 2018 construction environmental management plan

Appendix B7: Construction Waste Management Plan

636Kb
September 2018 construction environmental management plan

Appendix B8: Construction Contaminated Land Management Plan

856Kb
September 2018 construction environmental management plan

Appendix B10: Construction Acid Sulfate Materials Management Plan

1.03Mb

Other reports

Show filesHide files
File Title Size
June 2019 Construction Water Quality Results for Potential PASS Influences

Windsor Bridge Replacement Project.

1.94Mb
February 2019 Windsor Bridge Mobile Plant trial

Vibration monitoring results

863Kb
February 2019 WBRP – Ancillary Facilities Assessment Addendum Rev C

Windsor Bridge Replacement Project.

1.13Mb
February 2019 Compaction Roller Trial - Vibration Monitoring Results

Windsor Bridge Replacement Project.

385Kb
January 2019 Compaction Roller Trial - Vibration Monitoring Results

Windsor Bridge Replacement Project.

385Kb
January 2019 test piles vibration monitoring results - stage 1

Windsor Bridge Replacement Project.

829Kb
January 2019 test piles vibration monitoring results - stage 2

Windsor Bridge Replacement Project.

576Kb
September 2018 compliance tracking program

Windsor Bridge Replacement Project.

825Kb
June 2018 vegetation management plan

Windsor Bridge Replacement Project.

1.94Mb
February 2017 Interpretation Strategy (Stage 1)

Windsor Bridge Replacement Project.

3.83Mb
October 2016 Historical and Maritime Archaeological Research Design

Windsor Bridge Replacement Project.

4.45Mb
September 2018 Ancillary Facility Assessment

Windsor Bridge Replacement Project.

6.92Mb
September 2018 community communication strategy summary

Windsor Bridge Replacement Project.

480Kb
May 2018 Thompson Square Drain Heritage Mitigation and Options Report

Windsor Bridge Replacement Project.

18.8Mb
May 2018 Interpretation Plan – Thompson Square Conservation Area 14.5Mb
March 2018 Maritime Archaeological Testing Report and Detailed Salvage Strategy for Maritime Archaeological Excavation 9.07Mb
February 2018 Thompson Square and Windsor Bridge - Detailed photographic archival recording 43.6Mb
September 2017 submissions report

/projects/01documents/windsor-bridge-replacement/windsor-bridge-udlp-submissions-report-2017-09.pdf

1.21Mb
September 2017 Final Urban Design and Landscape Plan 76.7Mb
March 2017 Draft Urban Design and Landscape Plan 14.96Mb
October 2011 State Significant Infrastructure Application report 4.8Mb
October 2011 Community Issues Report 2.7Mb
August 2011 Windsor Bridge Options Report 3.27Mb
November 2009 Community Consultation Report 1.2Mb

Technical reports

Show filesHide files
File Title Size
Windsor Bridge Survey Data Comparison 2017 and 2019 850Kb
July 2019 Review of Operational Noise Mitigation Measures 2.51Mb
November 2017 Hydrological Mitigation Report 23.5Mb
Conditions of consent 2.32Mb
January 2018 Water Quality Monitoring Program 775Kb
April 2018 Design Compliance Report 428Kb
December 2017 Windsor Bridge Replacement Project Traffic Study 5.57Mb
November 2017 Sand Body Study 18.5Mb
November 2017 Detailed Salvage Strategy - Aboriginal and Historical 32.95Mb
August 2017 Location and design of Flood Warning Signs 604Kb
May 2017 Aboriginal testing report 28.9Mb
May 2017 Aboriginal testing report appendices 43.9Mb
May 2017 Historical Archaeological Testing report 10.9Mb
May 2017 Historical Archaeologial Testing report appendices 4.39Mb
August 2011 Government options review workshop report 440Kb
December 2017 Windsor Bridge Replacement Project Traffic Study 5.57Mb
August 2011 Built heritage and archaeological landscape investigations - sections 1-4 5.54Mb
August 2011 Built heritage and archaeological landscape investigations - sections 5-7 4.4Mb
August 2011 Built heritage and archaeological landscape investigations - appendix A part 1 4.3Mb
August 2011 Built heritage and archaeological landscape investigations - appendix A part 2 3.53Mb
August 2011 Built heritage and archaeological landscape investigations - appendix A part 3 3.72Mb
August 2011 Flora and fauna investigations 3.82Mb
August 2011 Hydraulic analysis 1.64Mb
August 2011 Landscape and visual investigation 1.3Mb
August 2011 Preliminary aboriginal archaeological and cultural heritage baseline investigations - sections 1-4 4.76Mb
August 2011 Preliminary aboriginal archaeological and cultural heritage baseline investigations - sections 5-9 2.54Mb
August 2011 Preliminary aboriginal archaeological and cultural heritage baseline investigations - appendices 976Kb
August 2011 Preliminary urban design and heritage review of options 1 and 3 6.35Mb
August 2011 Punt and whalf sites, maritime archaeological inspection 1.87Mb
August 2011 Socio-economic investigations 4.35Mb
August 2011 Traffic modelling and evaluation of options - preliminary report 4.95Mb
July 2011 Windsor Bridge Graphitisation Investigation 1.63Mb
June 2011 Bridge over the Hawkesbury River at Windsor Load Testing Report 1.01Mb
June 2011 Windsor Bridge U/W Bridge Follow up Inspection Report 412Kb
May 2011 Windsor Bridge U/W Bridge Inspection Report 8.2Mb

 